Availability
Wheel, Venom, Aluminum, Gloss Black, Machined, 15 in. x 10 in., 5 x 4.50 in./114.3mm Bolt Circle, 6.50 in. Backspace, Each
Part Number: SUM-149B-516525
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Gaskets, Full Set, Chevy, Small Block, Gen I, TBI, Set
Part Number: SUM-G2602
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Step Bars, Oval, Steel, Black Powedercoated, 4 in. Diameter, Extended Cab, Chevy, GMC, Pair
Part Number: SUM-710202-B
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Winch, Electric, 12 V, Hawse Fairlead, 3,500 lbs. Pull Rating, 39 ft. Synthetic Line Length, Remote, Kit
Part Number: SUM-931350
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Covers, Tall, Fabricated Aluminum, Black Powdercoated, Chevy, Small Block, Pair
Part Number: SUM-440602
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Brake Rotor, Iron, Zinc Plated, Drilled/Slotted, Chevy, Pair
Part Number: SUM-BRC-62007PR
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Engine Dress Up Kit, Steel, Chrome, Chevy, Small Block, Kit
Part Number: SUM-CSUM103
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Radiator Hoses, Silicone, Blue, Chevy, 5.0L, 5.7L, Kit
Part Number: SUM-391220
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Piston Rings, Pro GPX Gas Ported, 4.030 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP403012
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Chain and Gear Set, Double Roller, Billet, 3 Bolt, 1 Cam Sensor, Adjustable, Chevrolet, LS, Set
Part Number: SUM-G6646-BA
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Tachometer Gauge, Direct-Fit, Replacement, 1979-87 Chevrolet, GMC, Truck/Blazer, GM#25054251 , Each
Part Number: SUM-RP22054
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Gear, Ring and Pinion, 3.42:1 Ratio, GM, 7.5 in./7.625 in, Set
Part Number: SUM-741013
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Mechanical Flat Tappet, Advertised Duration 282/286, Lift .531/.542, Chevy, Small Block, Each
Part Number: SUM-CT108
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Cover, 1-piece, Early Style, Aluminum, Natural, Ford, With Dipstick and Fuel Pump Boss, Each
Part Number: SUM-G6335
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Cell, Aluminum, Natural, 4 Gallons, Each
Part Number: SUM-293204
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Gear, Ring and Pinion, 3.73:1 Ratio, GM, 8.2 in., 25 Spline Pinion, Set
Part Number: SUM-741021
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Chevy, V6/V8 Small Block, Set
Part Number: SUM-G6601R-B
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Summit HDR LS1 LS2 LS3 LQ9 Pushrods 5/16 7.350 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957350
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Air Cleaner, Round, Dropped Base, Filter Element Top Design, Red Filter, 14 in. Diameter, 3 in. Filter Height, Each
Part Number: SUM-239517
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Covers, Stock Height, Cast Aluminum, Polished, Plain, Centerbolt, Chevy, Small Block, Pair
Part Number: SUM-G3314
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Water Pump, Mechanical, High-Volume, Iron, Natural, Chevy, 427, 454, Short, Each
Part Number: SUM-312484
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Wheel and Tire Assembly, Trailer, Summit 550 series, Rambler tire, 15 x 5, 5 x 4.50 in., Silver, ST205/75R15, Load Range D. Each
Part Number: SUM-550A20515DS
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Piston Rings, Ductile Plasma Iron Top, Ductile second, Std. Tension oil, File Fit for 4.310 in. bore 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-1362M851065
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Transmission Pan, Deep, Aluminum, Natural, Finned with Summit® Logo, Buick, Chevy, Oldsmobile, Pontiac, TH400, Each
Part Number: SME-1001
Estimated Ship Date: Feb 16, 2026 if ordered today
Estimated Ship Date: Feb 16, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Air Cleaner, Oval, Flat Base, Aluminum, Black, Part Finned Design Top, 8 1/4 in. Width, 15 in. Length, Each
Part Number: SUM-239044B
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.