Availability
JEEP Summit Racing Parts and Accessories
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Dr..side,
Part Number: SUM-HEMI2125761D
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Strut, Loaded, Twin Tube, Front, Driver Side, Dodge, Jeep, Each
Part Number: SUM-SA11581
Estimated Ship Date: May 5, 2026 if ordered today
Estimated Ship Date: May 5, 2026 if ordered today
Oil Pan Gaskets, One-piece Gasket, Rubber/Steel Core, One-piece Rear Main Steel Style, American Motors, International, Jeep, L6, Each
Part Number: SUM-121260
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Radiators, Classic OEM, Downflow, Copper/Brass, 4 Rows, Black, Transmission Cooler, Jeep, 5.9L, 6.6L, Each
Part Number: SUM-382057
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Alternator, External Regulator, 235 Amp, Natural Finish, Jeep Wrangler JK, Each
Part Number: SUM-810323
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Headlights, LED, 7 in. Diameter, Round, 105 Watt, Clear Lens, Black Housing, DRL, Turn Signal, Jeep, JL, Pair
Part Number: SUM-890281
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Exhaust System, Cat-Back, 2.50 inch, Single Rear Exit, Steel, Aluminized, Jeep, 2.5, 4.0L, Kit
Part Number: SUM-640004
Estimated Ship Date: May 6, 2026 if ordered today
Estimated Ship Date: May 6, 2026 if ordered today
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2003-08 5.7 and 2005-10 6.1 G3 Hemi Standard Clearance, 1/2 Upper groove, set
Part Number: SUM-2220HS
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Wheel, 550 Trailer Wheel, Steel, Silver Modular, 15 in. x 6 in., 6 x5.5 in. Bolt Circle, 3.00 in. Backspace, Each
Part Number: SUM-550-56655S
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro Hemi 251 Long-runner Cam, MDS and VVT Delete, 251/257 Duration @.050, 116.5 LSA + 5 adv, .625/.625 Lift, Valve Reliefs Required, 4200-7700 Range
Part Number: SUM-5744
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro Hemi Supercharged 2 Cam, MDS Delete, Phaser Limited or Delete, 212/224 Duration @.050, 115.5 LSA + 2.5 adv, .625/.625 Lift, 2700-6700 Range, Each
Part Number: SUM-5715
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro Hemi Turbo 1 Cam, MDS Delete, Phaser Limited or Delete, 218/224 Duration @.050, 112 LSA + 2 adv, .625/.625 Lift, 3000-6800 Range, Each
Part Number: SUM-5731
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro Hemi Turbo 3 Cam, MDS Delete, Phaser Limited or Delete, 228/232 Duration @.050, 115 LSA + 1 adv, .625/.625 Lift, 3500-7200 Range, Each
Part Number: SUM-5733
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Header Flanges, 304 Stainless Steel, 3/8 in. Thick, 2.000 in. Diameter D-Port, Mopar Hemi Gen III, Pair
Part Number: SUM-270209ST
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Header Flanges, 304 Stainless Steel, 3/8 in. Thick, 1.875 in. Diameter D-Port, Mopar Hemi Gen III, Pair
Part Number: SUM-270205ST
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Distributor Cap, Male/HEI, Black, Replacement Cap for SUM-850222, Each
Part Number: SUM-850222-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Battery, Red Top, 6 V, Starting, 800 Cold Cranking Amps, Top Post, BCI Group 6V, Hold Down and Cable Included, Kit
Part Number: CMB-06-0121
Not Yet Reviewed
Tail Lamp Assembly RH 97-01 CHEROKEE CH2801128 Each
Part Number: SUM-CS082-U000R
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Engine Harness, 1979 Jeep CJ7, V8, With AutolTrans, Reproduction Of OEM#5469936, Best Quality, Built From OEM Blue Prints, Each
Part Number: SUM-RP23085
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Coil on Plug Boots, Springs, Chrysler, Dodge, Jeep, 5.7L, 6.1L, Set of 8
Part Number: SUM-850556
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Control Arms, Front Rear Top and Bottom for 1997-06 TJ/LJ with lift kits, Double Adjustable, Polyurethane Johnny Joint rod ends,Fasteners inc., Ea.
Part Number: SUM-770270
Not Yet Reviewed
Estimated Ship Date: Apr 24, 2026 if ordered today
Estimated Ship Date: Apr 24, 2026 if ordered today
Oil Pan Drain Plug, Magnetic, Steel, Orange Powdercoated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102O
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Signal/Park Lamp Assembly LH 84-96 Cherokee 86-92 Comanche 84-86 Wagoneer Chrome UNDER THE HEADLIGHT CH2530101 Each
Part Number: SUM-CS002-U000L
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 60, Dana 61, 32 Spline, 4 Series, Each
Part Number: SUM-730979
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Headlight Assembly LH 08-12 Liberty CH2502196 Each
Part Number: SUM-CS274-B001L
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster