Availability
DODGE Summit Racing Parts and Accessories
Oil Pan, Steel, Gold Zinc, 4 qt., Dodge, Small Block, 273/318/340, Each
Part Number: SUM-G3535
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Brake Rotors, Drilled/Slotted, Iron, Zinc Dichromate Plated, Front, Chrysler, Dodge, Pair
Part Number: SUM-BRC-63061PR
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transmission Pan, Deep, Aluminum, Natural, Finned with Summit Logo, Chrysler, Torqueflite 727, Each
Part Number: SME-1009
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Heater Cores, Classic OEM, Copper/Brass, Natural, Dodge, Each
Part Number: SUM-382206
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Chrysler, 273, 318, 340, Each
Part Number: SUM-C4277
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Carpet, Passenger Area, Loop, Black, 66-70 Dodge, Plymouth, B-Body, Automatic Transmission, Kit
Part Number: SUM-461042
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Thermostat, 180 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Chrysler, Dodge, Jeep, Hemi, Each
Part Number: SUM-362-180
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Mopar, Small Block, Set
Part Number: SUM-G6603R-B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Combo, Scat Rally 1000 Seats, Black, Vinyl, Brackets, Sliders, Dodge, Plymouth, Kit
Part Number: CMB-27-0011
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Flexplate, External Balance, Mopar SB 360 1971-92, TF-727 10 in. or 11.125 in. Converter, 6 Bolt Crank, SFI 29.1, Each
Part Number: SUM-G124SFI
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Camshaft, 1-Bolt, Hydraulic Flat Tappet, Advertised Duration 288/298, Lift .444/.466, Mopar, Big Block, Each
Part Number: SUM-6400
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fuel Injector, Diesel, Dodge, 5.9L, Cummins, 2004.5-2007, Each
Part Number: SUM-240076
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Step Bars, Steel, Black Powdercoated, Round, 3 in. Diameter, Crew Cab, Dodge, Pair
Part Number: SUM-710151-B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Camshaft, 1-Bolt, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Mopar, Big Block, Each
Part Number: SUM-6401
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Wheel, Fast-Five, Aluminum, Polished, 15 in. x 7 in., 5 x 4.5 in., Bolt Circle, 4 in. Backspace, Each
Part Number: SUM-521P-57650
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 44, 3 Series, 30 Spline, Each
Part Number: SUM-730972
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Lifters, Hydraulic Roller, Link Bar, 0.903 in. Outside Diameter, 2.685 in. Seat Height, Dodge, Plymouth, Chrysler, Set of 16
Part Number: SUM-HT224-16
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi MDS Delete kit With VVT, Stage 1, Kit
Part Number: CMB-09-0036
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Water Pump, Mechanical, High-Volume, Iron, Natural, Mopar, Big Block, Each
Part Number: SUM-312317
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Bellhousing Dowel Pins, .500 in. Diameter, .007 in. Offset, Ford, Mopar, Lincoln, Mercury, Pair
Part Number: SUM-192004
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Kit
Part Number: CMB-09-0038
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Brake Rotors, Cross-Drilled/Slotted, Iron, Zinc Dichromate Plated, Front, Dodge, RAM, Chrysler, Pair
Part Number: SUM-BRC-67053PR
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cab Visor, Sportvisor, Fiberglass, White Gelcoat, Dodge, Pickup, Each
Part Number: SUM-480074
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Sway Bar, Gray Hammertone, Steel, Front, 1 1/8 in. Diameter, Dodge, Plymouth B=-Body, Kit
Part Number: SUM-720230
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Cylinder, Power Brake Conversion, Dual Bowl, Cap, Reservoir, Booster, Dodge, Plymouth, B-Body, Kit
Part Number: SUM-760192
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster