Availability
DODGE Summit Racing Engines & Components
Pro Hemi Supercharged 4 Cam, MDS Delete, Phaser Limited or Delete, 224/238 Duration @.050, 118 LSA + 5 adv, .625/.625 Lift, 3000-7000 Range, Each
Part Number: SUM-5717
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 228 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 228/244 Duration @.050, 118 LSA + 4 adv, .625/.625 Lift, 3800-6900 Range, Each
Part Number: SUM-5718
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point, Chromoly, Black Oxide, 5.9 Cummins 12 valve, Kit
Part Number: SUM-910510
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Mockup Block, Chrysler Gen III Hemi,5.7,6.1,6.4, Long Block, Steel, Includes bolts, Each
Part Number: SUM-774007
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Engine Hardware Kit, 1968-69 Mopar, 426 Hemi, Complete OE Style Engine Fastener Kit In One Package, 199 Piece Kit
Part Number: SUM-RP80375
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Turbo 1 Cam, MDS Delete, Phaser Limited or Delete, 218/224 Duration @.050, 112 LSA + 2 adv, .625/.625 Lift, 3000-6800 Range, Each
Part Number: SUM-5731
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Turbo 3 Cam, MDS Delete, Phaser Limited or Delete, 228/232 Duration @.050, 115 LSA + 1 adv, .625/.625 Lift, 3500-7200 Range, Each
Part Number: SUM-5733
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Supercharged 3 Hydraulic Roller Cam, 218/228 Duration @.050, 117 LSA + 5 adv, .625/.625 Lift, 2900-6900 Range, Each
Part Number: SUM-5716
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 238 Long-runner Cam, MDS and VVT Delete, 238/248 Duration @.050, 116.5 LSA + 3.5 adv, .625/.625 Lift, Valve Reliefs Required, 3700-7200 Range
Part Number: SUM-5742
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 251 Long-runner Cam, MDS and VVT Delete, 251/257 Duration @.050, 116.5 LSA + 5 adv, .625/.625 Lift, Valve Reliefs Required, 4200-7700 Range
Part Number: SUM-5744
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 248 Short-runner Cam, MDS and VVT Delete, 248/264 Duration, 109.5 LSA + 4.5 Adv. .625/.625 lift 4,400-7,600 basic range, 2009+ 5.7 6.2 6.4
Part Number: SUM-5755
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 251 Short-runner Cam, MDS and VVT Delete, 251/264 Duration, 110 LSA + 4 Adv. .625/.625 lift 4,800-8,000 basic rpm range, 2009+ 5.7 6.2 6.4
Part Number: SUM-5756
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Chrysler LA Long Snout Best Hydraulic Roller Cam 3, 224/236 Duration, 112 LSA + 3 Adv. .550/.550 lift 1.5 ratio, .587/.587 1.6 ratio, 3,200-6,700 rpm
Part Number: SUM-5772
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 2, 218/226 Duration, 111 LSA + 2 Adv. .560/.554 lift 1.6 ratio, .595/.588 1.7 ratio, 3,000-6,500 rpm
Part Number: SUM-5776
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 244 Short-runner Cam, MDS and VVT Delete, 244/257 Duration, 109 LSA + 5 Adv. .625/.625 lift 4,300-7,500 basic rpm range, 2009+ 5.7 6.2 6.4
Part Number: SUM-5754
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, 0.005 in. Oversize Bronze Bushing, Dodge, Cummins, 5.9L, 24 Valve, Kit
Part Number: SUM-141570-OS
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Pan, Reproduction, Big Block, 1972-1978 Dodge Truck, OE Style, Rear Sump, Each
Part Number: SUM-RP80528
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Engine Hardware Kit, 1966-67 Mopar, 426 Hemi, Complete OE Style Engine Fastener Kit In One Package, 195 Piece Kit
Part Number: SUM-RP80372
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro BBM MOPAR Best Hydraulic Roller Cam 2, 218/226 Duration, 110 LSA + 0 Adv. .525/.520 1.5 rocker, .560/.555 1.6 rocker, 2,200-5,800 basic rpm range
Part Number: SUM-5781
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Chrysler LA Long Snout Best Hydraulic Roller Cam 2, 218/226 Duration, 111 LSA + 2 Adv. .525/.520 lift 1.5 ratio, .560/.554 1.6 ratio, 2,300-6,000 rpm
Part Number: SUM-5771
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 4, 232/248 Duration, 112 LSA + 5 Adv. .550/.550 lift 1.6 ratio, .624/.624 1.7 ratio, 3,500-7,000 rpm
Part Number: SUM-5778
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Piston Rings, Complete Set, 4.233 in. Bore, 0.020 in. Oversize, Dodge, 6.7L Cummins, Set
Part Number: SUM-5872D-50
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Engine Hardware Kit, 1969-71 Mopar, 440-6V, Complete OE Style Engine Fastener Kit In One Package, 166 Piece Kit
Part Number: SUM-RP80377
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Engine Hardware Kit, 1970 Mopar, 426 Hemi, Complete OE Style Engine Fastener Kit In One Package, 193 Piece Kit
Part Number: SUM-RP80379
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 238 Short-runner Cam, MDS and VVT Delete, 238/257 Duration, 109 LSA + 5 Adv. .625/.625 lift 4,100-7,300 basic rpm range, 2009+ 5.7 6.2 6.4
Part Number: SUM-5753
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster