Availability
DODGE Summit Racing Engines & Components
Cylinder Deactivation Delete Combo, Early 5.7 Gen III Hemi, MDS Delete Kit Without VVT, Stock spec cam, Kit
Part Number: CMB-09-0043
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 206 Cam, MDS Delete, Phaser Limited or Delete, 206/212 Duration @.050, 112.5 LSA + 1.5 adv, .600/.585 Lift, 1800-6000 Range, Each
Part Number: SUM-5711
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2003-08 5.7 and 2005-10 6.1 G3 Hemi .010 undersize (thicker) 1/2 Upper groove, set
Part Number: SUM-2220H25
Not Yet Reviewed
Estimated Ship Date: Apr 10, 2026 if ordered today
Estimated Ship Date: Apr 10, 2026 if ordered today
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar BB, Dowled, .010 undersized (thicker), set
Part Number: SUM-527HD010
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, G3 Hemi .010 undersize (thicker), set
Part Number: SUM-1808H25
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 244 Long-runner Cam, MDS and VVT Delete, 244/251 Duration @.050, 116 LSA + 5 adv, .625/.625 Lift, Valve Reliefs Required, 3900-7400 Range
Part Number: SUM-5743
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Supercharged 4 Cam, MDS Delete, Phaser Limited or Delete, 224/238 Duration @.050, 118 LSA + 5 adv, .625/.625 Lift, 3000-7000 Range, Each
Part Number: SUM-5717
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi 228 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 228/244 Duration @.050, 118 LSA + 4 adv, .625/.625 Lift, 3800-6900 Range, Each
Part Number: SUM-5718
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point, Chromoly, Black Oxide, 5.9 Cummins 12 valve, Kit
Part Number: SUM-910510
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Combo, Engine Oil Change Kit, 5W30 8 Qts., Kit
Part Number: CMB-08-0099
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Timing Tape, 7 1/4 in. Diameter Balancer, Chrysler, Big Block, Each
Part Number: SUM-168593
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Mockup Block, Chrysler Gen III Hemi,5.7,6.1,6.4, Long Block, Steel, Includes bolts, Each
Part Number: SUM-774007
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar BB, Dowled, .001 Extra Clearance, set
Part Number: SUM-527HXDS
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Timing Tape, 7 1/4 in. Diameter Balancer, Chrysler, 340, Each
Part Number: SUM-167598
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Alternator Mounting Hardware Kit, 1969-74 Mopar 383/400, with Air Conditioning, OE Style Fasteners, 7 Piece Kit
Part Number: SUM-RP80389
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Dr..side,
Part Number: SUM-HEMI2125761D
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gen. 3 Hemi CNC Cylinder head, 5.7/6.1L, 212cc Int. runner, 69cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Pass.side,
Part Number: SUM-HEMI2125761P
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, G3 Hemi .001 undersize (thicker), set
Part Number: SUM-1808H025
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Alternator Mounting Hardware Kit, 1970-71 Mopar 318/340, without Air Conditioning, OE Style Fasteners, 5 Piece Kit
Part Number: SUM-RP80387
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gen. 3 Hemi CNC Cylinder head, 6.2/6.4L, 212cc Int. runner, 73cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Pass..side,
Part Number: SUM-HEMI2126264P
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Master Engine Hardware Kit, 1968-69 Mopar, 426 Hemi, Complete OE Style Engine Fastener Kit In One Package, 199 Piece Kit
Part Number: SUM-RP80375
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Turbo 1 Cam, MDS Delete, Phaser Limited or Delete, 218/224 Duration @.050, 112 LSA + 2 adv, .625/.625 Lift, 3000-6800 Range, Each
Part Number: SUM-5731
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Turbo 3 Cam, MDS Delete, Phaser Limited or Delete, 228/232 Duration @.050, 115 LSA + 1 adv, .625/.625 Lift, 3500-7200 Range, Each
Part Number: SUM-5733
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro Hemi Supercharged 3 Hydraulic Roller Cam, 218/228 Duration @.050, 117 LSA + 5 adv, .625/.625 Lift, 2900-6900 Range, Each
Part Number: SUM-5716
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
SB Mopar 360 Forged Steel Crank, 4.000 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3604000
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster