Availability
Summit Racing Fasteners & Hardware
Hex Nuts, Steel, Zinc Plated, 3/8-16 in., Set of 10
Part Number: SUM-HK-37CNAN1Z
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Zinc, Hex, 6mm x 1.0, Grade 8.8, 25mm Underhead Length, Set of 25
Part Number: SUM-HK-M6C25
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Washers, SAE Flat, Steel, Zinc Plated, 3/8 in., Set of 10
Part Number: SUM-HK-37NSAE1Z
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolt, Hex Head Cap Screw, Grade 8, Steel, Zinc Plated, 1/2 in.-13 RH, 1.750 in. Length, Set of 4
Part Number: SUM-566011
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Zip Ties, Cable Ties, Nylon, Red, 8.0 in. Ties (150), 5.75 in. Ties (50), and 4.0 in. Ties (50), Set of 250
Part Number: SUM-G1871-RED
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Head Stud Nuts And Washers, 12 point 7/16-20 nuts and Flat ground head bolt washers, Set of 10 each
Part Number: SUM-910529-W
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Fastener Hardware Assortment, J and U Nuts, 5/16 in.-10, #14, 1/4 in.-20, Steel, Kit
Part Number: SUM-RP10037
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Screws, Self Tapping, Phillips Oval Head, Steel, Chrome, 10 x1, Set of 25
Part Number: SUM-RP10060
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Locking Washer kit Nord-Lock, 14mm. Pack of 4
Part Number: SUM-NLCS-M14
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cap Screws, Washers, Nuts, 5 mm - 12 mm, Nuts, Flats, Locks, Hex Cap Metric, Contains 24 Different Sizes, 698 Pieces
Part Number: SUM-RP10087
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Quick Fasteners, Fastener Head, Steel, Cadmium Plated, Flush Slotted, 0.550 in., Set of 40
Part Number: BPK-1119
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Wiring Clip Kit, 1968 Ford Mustang, Complete OE Style Kit In One Package, 28 Piece Kit
Part Number: SUM-RP24426
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolt, Replacement, Leaf Spring Front Hanger Bracket Bolt, Steel, Black Oxide, 3/8-16, Chevy, Pontiac, Each
Part Number: SUM-RP23757
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Body Molding Fasteners, Summit Racing™ Window Reveal Molding Clips, GM Style, Steel, Black Phosphate, Set of 20
Part Number: SUM-RP10014
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Zinc, Hex, 3/8-16 in. x 1.50 in., Grade 5, Set of 10
Part Number: SUM-HK-37C150
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolt, Hex Head Cap Screw, Grade 8, Steel, Zinc Plated, 3/8 in.-24 RH, 1.500 in. Length, Set of 4
Part Number: SUM-566007
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Zinc, Hex, 3/8-16 in. x 0.75 in., Grade 5, Set of 10
Part Number: SUM-HK-37C75
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Washers, Split Lock, Steel, Zinc Plated, 3/8 in., Set of 10
Part Number: SUM-HK-37NMLW1Z
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Nut Inserts, Threaded, 1/4-20 in. Thread, 3/8 in. Hole Size, Stainless Steel, Pair
Part Number: SUM-G1695
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Chrome, Hex Head, 5/16 in.-18, 0.750 in. Length, Set of 10
Part Number: SUM-56511274
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Restoration hardware ,Flat Washer, Plated , 3/16 x 3/4 , 1/4 x 1 1/4 , 5/16 x 1 1/4 , 3/8 x 1- 1/4 , 200 PCS
Part Number: SUM-RP10039
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Fasteners, Summit Racing™ Bulk Nuts, Barrel Nut, 3/16 in.-24, Steel, Black, Set of 25
Part Number: SUM-RP10011
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Zinc, Hex, 5/16-18 in. x 0.50 in., Grade 5, Set of 20
Part Number: SUM-HK-31C50
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Pin, T-Handle, Quick-Release, 12,800 lbs. Double Shear Load, 4130 Steel, Gold Iridited, 5/16 in. Diameter, .500 in. Length, Each
Part Number: SUM-793015
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bolts, Steel, Zinc, Hex, 1/4-20 in. x 0.75 in., Grade 5, Set of 25
Part Number: SUM-HK-25C75
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster