Availability
Valve Cover Bolts, Replacement, Hex, Steel, Chrome, 1/4-20 in. Thread Size, Chevy, 5.0L, 5.7L, Set of 8
Part Number: SUM-910218
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Gold Zinc, 7 qt., Chevy, Small Block, Each
Part Number: SUM-G36010
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Alternator Bracket, Steel, Chrome, Water Pump Mount, Universal Arm, Each
Part Number: SUM-G4049
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
PRO BBC H.R. 4 Hydraulic Roller Cam, 4/7 Swap, 224/232 Duration @ .050, 110 LSA + 5 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 2800-6300
Part Number: SUM-1254
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pump, Standard-Volume, Standard Pressure, Chevy, Big Block, Each
Part Number: SUM-122177SV
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Ford, 221-302, Set of 5
Part Number: SUM-172100
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Cover Grommet, PCV, 1.25 in. Outside Diameter, 0.75 in. Inside Diameter, Each
Part Number: SUM-G3427
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.125 in. length, .927 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6125927-1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 2618 Forged Piston, 3.903 bore, 1.326 C.H., 3cc mini dome, Std. Stroke, Gen. 3 Press-fit Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-3269453903-3
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, 2011-20 6.4 Charger, Challenger Durango Grand Cherokee VVT, Replaces MDS 05038419AB with no MDS, 273/276 Adv. Dur., 0.582/0.546 Lift, Each.
Part Number: SUM-5703
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Dipstick, Braided Stainless Steel, Tumble Polished, Chevy, Big Block, Each
Part Number: SUM-122203
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Pontiac, V8, Kit
Part Number: SUM-K2802
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Black Painted, 4 qt., Chevy, Big Block, Each
Part Number: SUM-G3510B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
SBF 302 Windsor Cast crank, 3.400 in. stroke, 5.400 rod, Nitride Hardened, External 28 0z. Balance, Req. Narrowed Rod bearings
Part Number: SUM-SBF3023400C
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, Pro GPX Gas Ported, 4.000 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP400012
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pulley, Power steering, Steel, Chrome, 1-Groove, V-Belt, 5.75 in. Diameter, .625 in. Bore, Keyway, Chevy
Part Number: SUM-G3973
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 2618 Forged Piston, 4.065 bore, 1.110 C.H., 21cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-110927406521
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston Rings, Pro GPX Gas Ported, 4.155 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP415543
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pickup, Standard Volume, Press Fit, Street/Strip Pan Style, 8 in. Pan Depth, 0.75 in. Tube Dia., Chevy, Big Block, Ea.
Part Number: SUM-G3622
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Dipstick with Tube, Engine, Steel, Chrome, Chevy, Big Block, Each
Part Number: SUM-G3866
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8707-2-DLTI
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 287/287, Lift .544/.544, Chevy, Big Block, Kit
Part Number: SUM-K03062
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Chrysler, 273, 318, 340, Each
Part Number: SUM-C4277
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Natural Finish, Includes Bolts, Grommets, Gaskets, Left/Drivers Side, GM LS, Each
Part Number: SUM-440550
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Gear Drive, Quiet, Dual Idler, Chevy, Small Block, Roller Cams Only, Set
Part Number: SUM-G6705-Q
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.