Selected Filters


Loading...

Availability


Summit Racing Engines & Components

Individual Parts

Results 376 - 400 of 2000 +

Forged Pro pistons BB Chevy 396, 4.155 bore, 1.765 C.H., 3.76 in. stroke, 6.135 in. rod, 32cc open/closed ch. Dome 10.5@110cc, 10.1@114cc, 9.6@119cc

Part Number: SUM-BBC396155

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Piston Rings, Gas Nitrided Steel Top, Martensitic Ductile Napier Second, Std. Tension Oil, File Fit for 4.005 in. Bore, 1.2mm, 1.2mm, 3.0mm, Set

Part Number: SUM-136SN9045010

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Chevy LS 4340 Forged Steel Crankshaft, 4.000 stroke, 24X Reluctor, Lightened, Nitride Hardened, Narrowed Rod Bearings Req.

Part Number: SUM-180LS400024

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valves, Intake, Stainless Steel, 1.940 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8

Part Number: SUM-V8000-8

4.6 out of 5 stars ( 15 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Forged Pro Mopar SB 4340 Forged Steel I-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-MOP61238I

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Harmonic Balancer, SFI, External Balance, Steel, Clearcoated, Ford, 5.0L, Each

Part Number: SUM-C4270

4.4 out of 5 stars ( 10 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Summit HDR Pushrods Small Block Chevy 5/16 7.800 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends Heat-Treated, Set of 16

Part Number: SUM-14957800

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valve Cover Breather, Push-In, Round, Steel, Chrome, Plain, Each

Part Number: SUM-G3400

4.62 out of 5 stars ( 52 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Pro LS Piston and Rod Kit, 325 Cid., 3.780 bore, Standard 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings

Part Number: SUM-PR36L7807

4.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Camshaft, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Each

Part Number: SUM-1104

4.79 out of 5 stars ( 19 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Stage 4 Pro LS Truck Swap Cam, 226/230 112+4, .550 /.550 Lift, 3-bolt, Chevy, LS, Each

Part Number: SUM-8714R1

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valve Covers, Centerbolt Mounting, Cast Aluminum, Black Powdercoated, Chevy GM, LS/LSX, Gen III/IV, Pair

Part Number: SUM-440343B

3.75 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Kit

Part Number: SUM-K1104

4.39 out of 5 stars ( 28 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

PRO BBC H.R. 5 Hydraulic Roller Cam, 4/7 Swap, 232/242 Duration @ .050, 111 LSA + 6 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3000-6500

Part Number: SUM-1255

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Chevy, Big Block, Set of 5

Part Number: SUM-172200

4.69 out of 5 stars ( 13 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck

Part Number: SUM-326945810-7P

4.5 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valves, Exhaust, Stainless Steel, 1.500 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8

Part Number: SUM-V8008-8

4.3 out of 5 stars ( 10 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Camshaft, Hydraulic Flat Tappet, Advertised Duration 272/272, Lift .454/.454, Mopar, Small Block, Each

Part Number: SUM-1789

4.63 out of 5 stars ( 8 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Pistons, Forged Aluminum, Flat, 4.010 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8

Part Number: SUM-17407C-10

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

SBC Forged 427 Balanced Assembly, 4 in. stroke, 350 main, 2 pc. RMS, H-Beam Rod, Forged Piston 11.2:1@ 58cc, 10.5:1@64cc, 10.25:1@67cc, 9.75:1@72cc

Part Number: SUM-SBC427RB125

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Set of 16

Part Number: SUM-G6921B

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/290, Lift .449/.473, Ford, 5.0L H.O., 351W

Part Number: SUM-K4400

4.27 out of 5 stars ( 11 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS3 LS7 LS9 LQ4 LQ9 LM7

Part Number: SUM-8715R1

3.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Timing Pointer, Billet Aluminum, Black, Adjustable, 8 in. Balancer, Chevy, Small Block, Each

Part Number: SUM-163800

4.46 out of 5 stars ( 46 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit

Part Number: SUM-8719-1

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air