Selected Filters


Loading...

Availability


1975 Summit Racing Engines & Components

Individual Parts

Results 976 - 1000 of 1135

Piston, Hypereutectic, Flat, 4.030 in. Bore, Ford, SBF, Each

Part Number: SUM-17302C-30-1

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Main Bearings, Race Series Main Bearing Sets, 0.009 in. Crankshaft Undersize, Tri-metal Copper-lead Alloy, Ford, Small Block Windsor 302, Set of 5

Part Number: SUM-590H009

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

SB Mopar 360 Forged Steel Crank, 4.000 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.

Part Number: SUM-MOP3604000

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 312/322, Lift .537/.559, Chevy, Small Block, Kit

Part Number: SUM-K1109

3.63 out of 5 stars ( 8 )

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Pistons, Hypereutectic, Flat, 4.060 in. Bore, Chevy, Each

Part Number: SUM-17350C-60-1

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons BB Chevy 565, 4.600 bore, 1.120 C.H., 4.25 in. stroke, 6.535 rod, 8cc open/closed chamber Dome 11:1@110cc, 10.7@114cc, 10.2@119cc.

Part Number: SUM-BBC54046008L

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

SB Ford Windsor 4340 Forged Steel crank, 3.400 stroke, 5.400 in. Rod, 28 oz. Balancer , Req's Narrowed Rod Bearings, one or two piece rear seal

Part Number: SUM-SBF3023400

2.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Oil Pump and Pickup Assembly, Standard-Volume, Chevy, Small Block, Kit

Part Number: SES-3-60-08-018

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Valve Covers, Stock Height, Cast Aluminum, Finned, Copper Plated, Pontiac, V8, Pair

Part Number: SUM-440419CPR

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.535 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC65352H

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Oil Pan Drain Plug, Magnetic, Steel, Orange Powdercoated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each

Part Number: SUM-120102O

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBF 302 Windsor, .001 Extra Clearance, set

Part Number: SUM-634HXCS

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.700 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC67002H

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Engine Kit, Dish-Top Piston/Moly Ring, Rod/Main Bearings, Gaskets, Oil Pump, Timing Set, Chevy, 350, Kit

Part Number: SES-3480111000

Not Yet Reviewed

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Engine Kit, Crank, Moly Ring, Rod, Main, Gaskets, Oil Pump, Timing Set, Chevy, 357, Kit

Part Number: SES-3484000050

Not Yet Reviewed

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Crankshaft, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 4.000 in. Stroke, Chevy, 350, Each

Part Number: SUM-SBC35040002P

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.535 in. Length, .990 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC65358H

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Rocker Arm, Roller Tip, Cast Steel, 3/8 in. Stud Mount, 1.6 Ratio, Chevy, Small Block, Each

Part Number: SUM-141707PL-1

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons for Olds 455, 4.155 bore, 1.750 C.H., 4.250 in. stroke, 6.735 in. rod, 17cc dish, 10.25@58cc, 9.9@60cc, 9.5@64cc, 9.2@88cc.

Part Number: SUM-BBO455030

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons for Chrysler 360 stroker, 4.040 bore, 1.465 C.H., 4 in. stroke, 6.123 in. rod, 15cc Dish 10.9@60cc, 10.5@63cc, 10.3@65cc, 9.6@73cc

Part Number: SUM-360040STR

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons for Pontiac 455, 4.190 bore, 1.490 C.H., 4.210 in. stroke, 6.625 in. rod, 17cc dish, 11.4:1@64cc, 10.5@72cc, 9.9@80cc, 9.3@87cc.

Part Number: SUM-BBP455030

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons Olds 350, 4.087 bore, 1.612 C.H., 3.385 in. stroke, 6 in. rod, 0cc flat top, 10.5@68cc, 10.37@69cc, 10.25@70cc, 9.7@75cc, 9.3@79cc

Part Number: SUM-SBO350030

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Combo, Summit SFI Flexplate 168-Tooth, Harmonic Balancer, Fluidamper, Flexplate Bolts, Chevy, 265-350, Kit

Part Number: CMB-13-0083

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons for SB Chevy 400, 4.165 bore, 1.425 C.H., 3.75 in. stroke, 5.7 in. rod, 12cc Dish, 10.5@64cc, 10.2@67cc, 9.8@72cc.

Part Number: SUM-SBC40040

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air

Forged Pro pistons for SB Chevy 350, 4.040 bore, 1.560 C.H., 3.48 in. stroke, 5.7 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72cc.

Part Number: SUM-SBC350040

Not Yet Reviewed

Estimated Ship Date: Monday 2/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 2/23/2026 if shipped by air