Selected Filters


Loading...

Availability


1965 Summit Racing Engines & Components

Individual Parts

Results 726 - 750 of 758

Pro BBF Big Block FE Best Hydraulic Roller Cam 3, 224/236 Duration, 111 LSA + 4 Adv. .582/.582 lift 1.75 ratio, 3,400 to 6,600 basic rpm, 390 428

Part Number: SUM-8917

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Forged Pro Mopar SB 4340 Forged Steel H-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Each

Part Number: SUM-MOP61238H-1

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, .001 undersize (thicker), set

Part Number: SUM-1227HC01

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, .010 undersize (thicker), set

Part Number: SUM-1227HC10

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Chrysler LA Long Snout Best Hydraulic Roller Cam 2, 218/226 Duration, 111 LSA + 2 Adv. .525/.520 lift 1.5 ratio, .560/.554 1.6 ratio, 2,300-6,000 rpm

Part Number: SUM-5771

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Chrysler LA Long Snout Best Hydraulic Roller Cam 3, 224/236 Duration, 112 LSA + 3 Adv. .550/.550 lift 1.5 ratio, .587/.587 1.6 ratio, 3,200-6,700 rpm

Part Number: SUM-5772

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBF 302 Windsor, Doweled, .001 undersize (thicker), set

Part Number: SUM-634HD001

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBF 302 Windsor, Doweled, .010 undersize (thicker), set

Part Number: SUM-634HD010

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBF 302 Windsor, Doweled, Standard Clearance, set

Part Number: SUM-634HDS

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBF 302 Windsor, Doweled, .001 Extra Clearance, set

Part Number: SUM-634HXDS

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar SB, .001 Extra Clearance, set

Part Number: SUM-481HXS

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Main Bearing, Ford 302 351 Cleveland stroker using SBC Rod .001 Undersize, Set

Part Number: SUM-1010H-01

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Main Bearing, Ford 302 351 Cleveland stroker using SBC Rod .001 Undersize Coated, Set

Part Number: SUM-1010HC-001

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Big Block PRO BBC H.R. 7 H.O. Cam, LS Firing Order, 248/264 Duration @ .050, 108 LSA + 4 Adv., .624/.624 with 1.7 ratio, .661/.661 with 1.8, 3900-7000

Part Number: SUM-1257-H-O

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Big Block PRO BBC H.R. 9 H.O. Cam, LS Firing Order, 255/264 Duration @ .050, 108 LSA + 4 Adv., .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4100-7200

Part Number: SUM-1259-H-O

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Big Block PRO BBC H.R. 10 H.O. Cam, LS Firing Order, 264/276 Duration @ .050, 108 LSA + 4 Adv., .700/.700 with 1.7 ratio, .741/.741 with 1.8 4200-7300

Part Number: SUM-1260-H-O

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Big Block PRO BBC H.R. 11 H.O. Cam, LS Firing Order, 270/276 Duration @ .050, 108 LSA + 1 Adv., .700/.700 with 1.7 ratio, .741/.741 with 1.8 4300-7400

Part Number: SUM-1261-H-O

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pro BBF Big Block FE Best Hydraulic Roller Cam 1, 212/218 Duration, 108.5 LSA + 1.5 Adv. .582/.582 lift 1.75 ratio, 2,500 to 6,000 basic rpm, 390 428

Part Number: SUM-8915

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Big Block PRO BBC H.R. 6 H.O. Cam, LS Firing Order, 242/256 Duration @ .050, 108 LSA + 4 Adv., .624/.620 with 1.7 ratio, .661/.655 with 1.8, 3800-6800

Part Number: SUM-1256-H-O

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Oil Pan, Cast Aluminum, Finned, Copper Plated, 5-Quart, Rear Sump, Driver Dipstick, Chevy, Small Block, Each

Part Number: SUM-G3526CPR

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Master Engine Hardware Kit, 1964-65 Mopar, 273, Complete OE Style Engine Fastener Kit In One Package, 117 Piece Kit

Part Number: SUM-RP80369

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Gears, Adjustable, Ford, Small Block/351W, 2-piece Fuel Pump Eccentric Only, Set

Part Number: SUM-G6651R-BA

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Main Bearing, Ford 302 351 Cleveland stroker using SBC Rod .010 Undersize Coated, Set

Part Number: SUM-1010HC-010

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pulley Kit, Serpentine Belt, Billet Aluminum, Black Anodized, 140 Amp Alternator - Power Steering - Air Conditioning, Small Block Ford, Kit

Part Number: SUM-340550BLK

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Oil Pump, Sportsman/Race, Nodular Iron, High-Volume, Hi Pressure, Chevy, Big Block, Each

Part Number: SUM-121177HVN

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air