Availability
Engine Rebuild Kit, Hypereutectic Flat Top, Plasmamoly Rings, Stock Bore, Bearings, Chevy, LS, Kit
Part Number: CMB-08-0068
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Cam and Lifter kit, Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, 2600-6600 Range
Part Number: SUM-K1205
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 undersize (thicker), Standard 120 Deg. Oil groove, set
Part Number: SUM-7299H001
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8707-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, Steel, Black, Water Pump Mount, Short Water Pump, Chevy, Small Block, Each
Part Number: SUM-G4015B
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
SB Chevy Forged Steel Crank, 3.750 Stroke, 1967-86 Blocks with 2-pc. RMS, Lightened, Nitride, Lightened and Bullnosed, Designed for 6.000 in. Rod
Part Number: SUM-SBC35037502P
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons BB Chevy 396, 4.125 bore, 1.765 C.H., 3.76 in. stroke, 6.135 in. rod, 32cc open/closed ch. Dome 10.5@110cc, 10.1@114cc, 9.6@119cc
Part Number: SUM-BBC396125
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Piston, 3.898 bore, 1.299 C.H., 3cc mini dome, Std. Stroke, 6.125 Full-float Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-2999273898-3
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, Steel, Chrome, Water Pump Mount, Long Water Pump, Chevy, Small Block, Set
Part Number: SUM-G4016
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Rod Bearings, Direct Replacement, 0.010 in. Crankshaft Undersize, Bi Metal, Chevy, Big Block, Set of 8
Part Number: SUM-171210
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Rocker Arm, 1.7 Ratio, Roller Fulcrum, Ductile Iron, Intake Only,Chevy GM, LS/LSX, Gen III/IV, Ofset, Each
Part Number: SUM-141551
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, Standard Clearance, Standard 120 Deg. Oil groove, set
Part Number: SUM-7299HS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Water Pump Pulley, Serpentine, Aluminum, Polished, Replacement for SUM-340400 Pulley Set Only, Each
Part Number: SUM-340400-3
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Pistons. 3.785 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273785-7
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, For SUM-G3977, Chrome, Steel, Chevy, Each
Part Number: SUM-G3979
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pan Drain Plug, Magnetic, 1/2-20 RH in. Threads, Seal, Each
Part Number: SUM-G15
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, Steel, Chrome, Water Pump Mount, Long Water Pump, Chevy, Big Block, Each
Part Number: SUM-G4018
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision Cam Bearings, Chevy LS first design 1997-03
Part Number: SUM-1000S00
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pistons, Hypereutectic, Dished, 4.040 in. Bore, Chevy, Set of 8
Part Number: SUM-17383C-40
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Rod Bearings, Direct Replacement, 0.030 in. Crankshaft Undersize, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171030
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S274000-2
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 4340 Rotating Assembly, 402 Cid., 4.000 bore, 4.000 stroke, 24X, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400008
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pan Drain Plug, Magnetic, Steel, Black Powdercoated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102B
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, Steel, Chrome, Water Pump Mount, Long Water Pump, Chevy, Small Block, Each
Part Number: SUM-G4017
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Dress-Up Kit, Steel, Chrome, Chevy, Big Block, Kit
Part Number: SUM-CSUM108
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.