Availability
Holley Performance Carbs & More
Throttle Body Intake Elbow, 105mm Bore Size, Aluminum, Natural, 5.12 in. Height, Ford, Each
Part Number: HLY-300-240F
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Rails, Holley EFI, LS Fuel Rails, Aluminum, Black Finish, -8 AN O-ring Inlet, Fittings, Hardware, for Hi-Ram Intakes, Chevy, 4.8-7.0L, Pair
Part Number: HLY-534-203
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Combo, Holley, Quick Change Vacuum Secondary Housing, Spring Assortment, Single 4-Barrel Carburetor, Kit
Part Number: CMB-03-0100
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Pumps, Retrofit, Electric, In-Tank, 67 gph, 255 lph, 60 psi, 12V, Steel Housing, Replacement, Each
Part Number: HLY-12-156
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Plates, Replacement, Throttle Base Plate, Cast Aluminum, Assembly, for Holley 0-3310C, 0-3310S, 0-80508S, Each
Part Number: HLY-112-117
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Tanks, Sniper, 20.5 Gallon, Steel ,Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Camaro, Kit
Part Number: SNE-19-108
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Choke Conversion Kits, Manual, Shiny Aluminum Choke Cover Plate, Holley 2300, 4150, 4160, Kit
Part Number: HLY-45-225SA
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Intake Manifolds, Sniper, Carbureted, Single, 4150 Flange, Rectangular Port, 1,800-7,000 RPM, Welded Aluminum, Silver, Chevy, 396-454ci, Each
Part Number: SNE-835011
Estimated Ship Date: Mar 17, 2026 if ordered today
Estimated Ship Date: Mar 17, 2026 if ordered today
Carburetor Components, Main Body, HP Series Upgrade, 750 cfm, Aluminum, Shiny Finish, Down-Leg Boost, Gaskets, Brass Jets, Brass Air Bleeds, Each
Part Number: HLY-134-300SA
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Injection Components, Sniper EFI, Throttle Body Installation, 2300 and 4150 Flange Style, Gaskets, Hardware, Kit
Part Number: SNE-520-1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Intake Manifolds, LS Mid-Rise, Standard Deck, Single Carburetor, Single Plane, 2,500-7,000 RPM Range, Aluminum, Satin Finish, Chevy, 6.0L, 6.2L, Each
Part Number: HLY-300-131
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Injection Systems Wiring Harnesses, Dominator EFI, J3 Auxiliary Harness, MPFI, Speed Density/Throttle, 17 Input/Outputs, Connector Included, Kit
Part Number: HLY-558-403
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Injectors, 160 lbs/hr., Tri-cone Spray, Bosch Plug, EV1 Body, 12V Saturated Circuit, 2.85 in. Seat Height, Low Impedance, 2.0 ohms, 8-pieces, Set
Part Number: HLY-522-168
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Tanks, Sniper, 16 Gallon, Steel, Silver, Fuel Pump, 13.5V, 106 gph, 1/4 in. Female Thread, Sending Unit, 0-30 ohm, Chevy, Chevy II, Kit
Part Number: SNE-19-413
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Transmission Cable Brackets, for Commander 950 MPI, 4-Barrel, TH-700R4, Each
Part Number: HLY-20-113
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Spacers, 4 Hole Style, 0.500 in. Thick, Phenolic Plastic, Natural Finish, Hardware, Gaskets, for 4150 Carburetors, Each
Part Number: HLY-17-59
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Jets, Standard Main, Gasoline, Number 58, Jet Size 0.0570 in., Brass, 1/4 in.-32 Thread, Pair
Part Number: HLY-122-58
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Gaskets, Fuel Bowl, Metering Block, Blue, Reusable Fiber, 2 Each, for Model 4160, Set
Part Number: HLY-108-201
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fuel Tanks, Sniper, 15.5 Gallon, Stock Replacement, Steel, Silver, Lock Ring Included, Jeep, CJ5, CJ7, Each
Part Number: SNE-19-510
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Caps and Plugs, Vacuum Line, Rubber, Assorted Sizes, Kit
Part Number: HLY-26-105
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Floats, Nitrophyl, Side Hung Bowls, Holley, Each
Part Number: HLY-116-1
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Pressure Regulator Mounts, Billet Regulator Bracket, Fuel Pressure, Aluminum, Black Anodized, Universal Design, for Model 4150, 4160 Series, Each
Part Number: HLY-20-275
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Throttle Bodies, LS Style, Multi-Port Injection, Cable Actuated, 1 Venturi, 105mm, Billet Aluminum, Black Anodized, Chevy, 4.8-7.0L, LS Based, Each
Part Number: HLY-112-583
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Carburetor Gaskets, Metering Block, Blue, Reusable Fiber, for Model 4500, 3 Circuit, Pair
Part Number: HLY-108-121
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Springs, Throttle Return, Dual, Stainless Steel, Natural Finish, Pair
Part Number: HLY-20-89
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster