Availability
1985 GMC Holley Parts and Accessories
Oil Pan, Engine Swap, Aluminum, Black Ceramic Coated, 4.250 in. Stroke, 5.5 Quarts, Chevy, 4.8, 5.3, 6.0L, Each
Part Number: HLY-302-1BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Track Series, Perimeter Bolt, Tall, Chevrolet Logo, Fabricated Aluminum, Black Satin, Baffled, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-279
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pans, Retrofit, LS Engine Swap, Rear Sump, Wet Style, 5.6 Quarts, Aluminum, Natural Finish, Chevy, GMC, 4.8L, 5.3L, 5.7L, 6.0L, 6.2L, 7.0L, Each
Part Number: HLY-302-4
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Truck, Kit
Part Number: SNE-19-157
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pedal Assembly Components, Drive-By-Wire Accelerator Pedal Bracket, Use with Holley 145-160 Pedal, Steel, Black Powdercoated, Chevy, GMC, Each
Part Number: HLY-145-112
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, M/T Series, Perimeter Bolt, Tall, Finned, Cast Aluminum, Black Powdercoat, Satin Finish, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-152
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Engine Swap, Aluminum, Black, 6.1 Quarts, Retrofit, Chevrolet, Gen V LT Engines, Each
Part Number: HLY-302-20BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pans, Retrofit, LS Engine Swap, Rear Sump, Wet Style, 5.6 Quarts, Aluminum, Black Finish, Chevy, GMC, 4.8L, 5.3L, 5.7L, 6.0L, 6.2L, 7.0L, Each
Part Number: HLY-302-4BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Track Series, Perimeter Bolt, Tall, Chevrolet Logo, Fabricated Aluminum, Silver Gloss, Baffled, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-280
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 22 Gallon, Stock Replacement, Steel, Silver Powdercoat, Lock Ring Included, Chevy, El Camino, Each
Part Number: SNE-19-583
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, M/T Series, Perimeter Bolt, Tall, Finned, Cast Aluminum, Polished Finish, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-151
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Pumps, Sniper, In-Tank, Retrofit, 12V, 92 gph, 5/16 in. Inlet, Hose Barb Outlet, Sending Unit, Chevy, GMC, Truck, 25 Gallon Tank, Each
Part Number: SNE-12-332
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Pumps, Mechanical, 80 gph, 7.5 psi, 1/4-NPT Female Thread, Inlet and Outlet, Aluminum, Silver, Rotatable, Chevy, 396-454ci, Mark IV, Each
Part Number: HLY-12-835
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Engine Swap, Aluminum, Natural, 6.1 Quarts, Retrofit, Drag Race, Chevy, 6.2L, LT1, Each
Part Number: HLY-302-22
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, M/T, Finned, Cast Aluminum, Black Textued, Baffled, Chevy, Gen, V, VI, Mark IV, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-85
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Track Series, Perimeter Bolt, Tall, Chevrolet Logo, Fabricated Aluminum, Polished, Baffled, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-278
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 16 Gallon, Steel, Silver, Fuel Pump, 13.5V, 67 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, GMC, Truck, Kit
Part Number: SNE-19-156
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pans, Gen III Hemi, Retrofit, VVT Engine, Wet Sump, Rear, 1-piece Main Seal, 6.2 Quart, Dipstick Passenger Side, Aluminum, Black, Hardware, Each
Part Number: HLY-302-76BK
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 16 Gallon, Stock Replacement, Steel, Silver, Lock Ring Included, Chevy, GMC, Truck, Each
Part Number: SNE-19-511
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 31 Gallon, Stock Replacement, Steel, Silver Powdercoat, Lock Ring Included, Chevy, Blazer, GMC, Jimmy, Each
Part Number: SNE-19-588
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pedal Brackets, Drive-By-Wire Accelerator Pedal Brackets, Steel, Black Powdercoated, Chevy, GMC, Each
Part Number: HLY-145-120
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Engine Swap, Low Profile, Aluminum, Black, 3.620 in. Stroke, 5.7 Quarts, Chevy, 4.8L, 5.3L, 6.0L, Each
Part Number: HLY-302-2BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan Baffles, Replacement, LS Swap, Off-Road Oil Pan, Aluminum, Satin Finish, for Holley 302-4, 4BK, Chevy, 4.8L, 5.3L, 5.7L, 6.0L, 6.2L, 7.0L, Kit
Part Number: HLY-302-33
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Tanks, Sniper, 17 Gallon, Stock Replacement, Steel, Silver Powdercoat, Lock Ring Included, Chevy, El Camino, Each
Part Number: SNE-19-549
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, M/T, Finned, Cast Aluminum, Polished, Baffled, Chevy, Gen, V, VI, Mark IV, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-84
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster