Availability
Carburetor Gaskets, Fuel Bowl, Buna Rubber, Blue, Non-Stick, for Model 2300, 4150, 4160, 4500, 2-Circuit Models, 10-Piece, Set
Part Number: HLY-1008-1911-1
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Returnless Pump, 3.5 in. Display, Kit
Part Number: SNE-550-510-3XD
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rebuid Kits, Fast Kit, Performance Tuning, Rebuild, Model 4160, 750 cfm, Gaskets, O-rings, Pump Diaphragm, Needle, Power Valve, Instructions, Kit
Part Number: HLY-37-754
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 350 lph, Gasoline, Chevy, Pontiac, Each
Part Number: SNE-12-370
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Filters, Inline, Billet Aluminum, Paper Material, 10 Microns, 100 gph, 3/8 in, NPT Female Threads, Each
Part Number: HLY-162-550
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 5.0 in. Display, Ford, Kit
Part Number: SNE-5505105PKSBF
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Tanks, Sniper, 20 Gallon, Steel, Silver, Fuel Pump, 13.5V, 106 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Kit
Part Number: SNE-19-407
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rebuid Kits, Fast Kit, Rebuild, Nostalgia Model 2300, 2-barrel, Gaskets, O-rings, Pump Diaphragm, Needle, Power Valve, Instructions, Kit
Part Number: HLY-37-396
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Rails, Holley EFI, LS Hi-Flow, Aluminum, Black Finish, -8 AN O-ring Inlet, Brackets, Fittings, Hardware, for Stock Intake, Chevy, 4.8-6.2L, Kit
Part Number: HLY-534-209
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 350 lph, Gasoline, Ford, Mercury, Each
Part Number: SNE-12-375
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pumps, Sniper, E85, In-tank, EFI, 12V, 90 gph, 11mm Inlet, 5/16 in. Outlet, Hose Barb, Chevy, Pontiac, Each
Part Number: SNE-19-369
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injectors, Terminator X, EFI, 120 lbs./hr., USCAR Plug, EV6/Pico Body, 12V Saturated, High Impedance, 1.85 in. Overall Height, 0.65 OD, Set of 8
Part Number: HLY-522-128XFM
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Carburetors, Gen 3 Ultra Dominator, 1,250 cfm, 4-barrel, Mechanical Secondaries, Dual Inlet, Black and Shiny Finish, Annular Booster, 3-circuit, Each
Part Number: HLY-0-80908BK
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 255 lph, Gasoline, Chevy, Buick, Olds, Pontiac, Each
Part Number: SNE-12-306
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Black, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 5.0 in. Display, Ford, Kit
Part Number: SNE-5505115PKSBF
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Calibration Kits, Carburetor Tuning, Calibration, Holley, Double Pumper Style, Metering Jets, Pump Nozzles, Power Valves, Gaskets, Screws, Each
Part Number: HLY-36-182
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Carburetors, Model 4150, Double Pumper, 700 cfm, 4-barrel, Square Bore, Manual Choke, Mechanical Secondaries, Dual Inlet, Gold Dichromate, Each
Part Number: HLY-0-4778C
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Carburetors, Street Avenger, 870 cfm, 4-barrel, Square Bore, Electric Choke, Vacuum Secondaries, Dual Inlet, Shiny Finish, Straight-leg Booster, Each
Part Number: HLY-0-80870
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Tanks, Sniper, 16 Gallon, Steel, Silver, Fuel Pump, 13.5V, 106 gph, 1/4 in. Female Thread, Sending Unit, 0-90 ohm, Chevy, Truck, Kit
Part Number: SNE-19-456
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Electric Fuel Pumps, HP Billet, 65 gph, 80 psi, -10 AN O-Ring, Female Inlet/-8 AN O-Ring Outlet, Each
Part Number: HLY-12-600
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pressure Regulators, Sniper, EFI, 40-130 psi, Bypass, Return Style, Inline, -6 AN Ends, Female Thread, Aluminum, Black, with Bracket, Each
Part Number: SNE-19-392
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 255 lph, Gasoline, Chevy, Each
Part Number: SNE-12-313
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Intake Manifolds, EFI, LS Mid-Rise, Cathedral Port Head, Multi-port, 92mm Bore, Standard Deck, Aluminum, Satin Finish, Chevy, 4.8-6.0L, Each
Part Number: HLY-300-126
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injection Systems, Terminator X Max, Stealth 4150 EFI, Four Injector, Throttle Body, Speed Density, Aluminum, Black, Tunable, Trans Control, Kit
Part Number: HLY-550-1012
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Fuel Injectors, Terminator X, EFI, 100 lbs./hr., USCAR Plug, EV6/Pico Body, 12V Saturated, High Impedance, 1.85 in. Overall Height, 0.65 OD, Set of 8
Part Number: HLY-522-108XFM
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.