Availability
Eagle Specialty Products: Connecting Rods, Crankshafts & More
Crankshaft, 1-Piece Seal, Internal Balance, Forged 4340 Steel, 3.622 in. Stroke, Chevy, 5.7, 6.0L, Each
Part Number: ESP-434636226100
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Rotating Assembly, Street, Cast Crank, Pistons, I-Beam Rods, Chevy, Small Block, Kit
Part Number: ESP-B15405E000
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
RODS
Part Number: ESP-CRS5571H3D
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
Connecting Rods, SIR 5140 Steel, I-Beam, 5.956 in. Length, Press Fit, Ford, Small Block, Set of 8
Part Number: ESP-SIR5956FP
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, 12-Point, Cap Screw, ARP 2000 Series, Eagle Rods Only, Set of 16
Part Number: ESP-20070
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
4340 H-BEAM ROD 5.700" 2.100 ROD
Part Number: ESP-CRS5700B3D-1
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Wrist Pin Bushing, 0.925 in Inside Diameter, 0.973 in. Outside Diameter, 1.058 Length, Bronze, Set of 8
Part Number: ESP-B928-8
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Crankshaft, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 4.375 in. Stroke, Chevy, 454, Each
Part Number: ESP-445443756385
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
5140 STEEL I-BEAM CHEV SB 6.200" BUSHED
Part Number: ESP-SIR6200BBLW
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Flexplates, Steel, 153-tooth, One-piece Rear Main Seal, Internal Balance, for Special Internal 0 Balance Applications, Chevrolet, Each
Part Number: ESP-FRA160ESP
Estimated Ship Date: Today
Estimated Ship Date: Today
4340 ROD FORD FOCUS ZETEC 4
Part Number: ESP-CRS5483F3D
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
Crankshaft, Internal Balance, Cast Steel, 3.58 in. Stroke, Chrysler, 360, Each
Part Number: ESP-103603580
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy/Ford, Big Block, Set of 8
Part Number: ESP-67003D
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, CRS 4340 H-Beam, 5.765 in. Length, Cap Screw, Bushed, Chevy, L4, Set of 4
Part Number: ESP-CRS5765C3D
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
4340 ROD 6.0" 2.10 LW
Part Number: ESP-CRS6000BLW-1
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
4340 ROD 6.76" CHRY .990
Part Number: ESP-CRS6760B3D
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Crankshaft, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 3.500 in. Stroke, Chevy, 350, Each
Part Number: ESP-4350350057FW
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
BUSHINGS WRIST PIN
Part Number: ESP-B991-8
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
connecting rod set,4340 H-beam rod Ford 2.3 Eco Boost
Part Number: ESP-CRS5876E3D
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
Wrist Pin Bushing, 0.860 in Inside Diameter, 0.973 in. Outside Diameter, 1.060 Length, Bronze, Set of 8
Part Number: ESP-B927-8
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolt, E Head Style, 8740 Chromoly Steel, 1.750 in. UHL, Eagle Rods Only, Each
Part Number: ESP-871700
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod, SIR I-Beam, 6.385 in. Length, Floating Pin Style, 0.990 in. Pin Bore, 2.325 in. Big End Bore, 8740 Rod Bolts, Forged 4150 Steel, Each
Part Number: ESP-SIR6385B-1
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod, I-beam, Forged 4340 Steel, Cap Screw, 6.385 in. Length, Chevy, Big Block, Set of 8
Part Number: ESP-FSI63852000
Estimated Ship Date: Jan 4, 2027 if ordered today
Estimated Ship Date: Jan 4, 2027 if ordered today
Crankshaft, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 3.750 in. Stroke, Chevy, 400, Each
Part Number: ESP-440037505700
Estimated Ship Date: Today
Estimated Ship Date: Today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster