Availability
BTR DIE CAST VALVE COVER SET RED WITHOUT COIL MOUNTS
Part Number: BTC-VCA-02-RED
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Timing Gear, Timing Sprocket, Steel Cam Gear, Single Pole Design LS1 and LS2, Fits Single-roller Chains, Chevrolet, 5.7L, 6.0L, Each
Part Number: BTC-BTR76407
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Engine Valley Cover Gasket, Rubber/Steel, Chevrolet, LS2, LS3, LS7, Each
Part Number: BTC-BTR10141
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR VALVE COVER SET NO LOGO NO COIL MOUNT RED VANITY PLATE
Part Number: BTC-VCA-03-REDVP
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Piston Ring Compressor, Solid, Aluminum, Black Anodized, 4.005 in. Diameter, Each
Part Number: BTC-BTRRC4005
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Cover Gasket, Steel/Rubber, Chevrolet, Small Block LS, Each
Part Number: BTC-BTR33904I
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR GEN V 5.3 TRUCK NORRIS CAMSHAFT
Part Number: BTC-BTR-GENV53TN
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.900 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7900375-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head Fastener, Bolt, Hex, Steel, Natural, Chevy, Small Block, Set
Part Number: BTC-BTR98545
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Piston Ring Compressor, Aluminum, Black Anodized, 3.630 in. Diameter, Each
Part Number: BTC-BTRRC3630
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR 6.4 HEMI VALVE SPRING KIT
Part Number: BTC-SK024
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Camshaft Phaser Limeters, Chevy, Gen V, Each
Part Number: BTC-S0428
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 11/32 in. Diameter, 7.375 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7375343-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Hose and Line Mounting Clamp, Billet P Clamp, Aluminum, Black, 0.750 in. Hose O.D., Each
Part Number: BTC-BHC34
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Hose Coupling, Black, Silicone, 3.00 in. Inlet, 4.25 in. Outlet, Straight, Reducer Style, Each
Part Number: BTC-S0359
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Locks, 7 degree, 1-groove, Machined, Steel, Radius Groove, + 0.050 in. Installation Height, Set of 32
Part Number: BTC-S0385
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Stem Seal Installation Tools, Aluminum, Black Anodized, Each
Part Number: BTC-T002
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, LS7 Stage 1 V2, 225 int./240 exh. Duration, 0.645 in./0.645 in. Lift, 118 LSA, 3-Bolt, 7.0L, Each
Part Number: BTC-BTRLS7STAGE1
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
BTR LS7 HEAD GASKETS SOLD IN PAIRS
Part Number: BTC-BTR-82179-2
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
CLAMP, BTR 1 3/16 INCH HOSE BILLET P CLAMP
Part Number: BTC-BHC1316
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Gear, Timing Sprocket, Steel Crank Gear, for Single Roller Chains, Chevrolet, Small Block LS, Each
Part Number: BTC-BTR56582
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Cover Gasket, Rubber, Chevy, LS, Each
Part Number: BTC-BTR37683
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Exhaust Manifold Gaskets, Multi-Layer Header Gaskets, Multi-layer Steel, Oval Port, Chevrolet, 5.3/6.2/6.6L Small Block Gen V, Each
Part Number: BTC-BTR-57093
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR STAGE 2 L83 GEN V CAM
Part Number: BTC-S0460
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.350 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7350375-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.