Availability
Camshafts, BTR, LS3 Stage 3 V2, 227 int. Duration, 0.636 int./0.636 exh. Lift, 111.5 LSA, 3-Bolt, Chevy, LS3, 6.2L, Each
Part Number: BTC-BTRLS3STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
ENGINE FASTENER, BTR ROD BOLT, GEN 4, LIKE 11570662 - BTR70662
Part Number: BTC-BTR70662
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.300 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7300312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR Stage 2 Turbo V2, Hydraulic Roller, 220 int./223 exh. Duration, 0.618 in./0.618 in. Lift, 113 LSA, 3-Bolt, Chevy, GMC, Each
Part Number: BTC-BTRTURBOSTG2
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Hydraulic Roller, Street/Towing Use, L86 DOD Delete, 200/206 Duration, 0.549 in./0.522 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2240006175
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 377 lbs./in. Spring Rate, Factory Valve Guides, Kit
Part Number: BTC-SK007-0560BB
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, V2 Series, Hydraulic Roller, Retro-fit, Street/Strip Use, LS1 Stage 3 V2, 227 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, LS, Each
Part Number: BTC-BTRLS1STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.850 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7850375-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.375 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7375312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Deactivation Components, DOD Delete Plugs, Chevrolet, Set
Part Number: BTC-CBI-OBO
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing, Roller Fulcrum, Chevrolet, 5.3L/6.2L/6.6L Gen V, 7.0L LS, Kit
Part Number: BTC-TK027
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Engine Gasket Sets, Chevrolet LS, Gen IV, Set
Part Number: BTC-BTR29793
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Hydraulic Roller, OE Roller, Supercharged Use, 226 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, 6.2L LS, Each
Part Number: BTC-S0402
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Red Powdercoated, Textured, Brian Tooley Racing Logo, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA02REDCM
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, Stage 2 Truck V2, 212 int./218 exh. Duration, 0.553 in./0.553 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31218110
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
AN Wrench, AN Hose End Wrench, Adjustable, Aluminum, Black, Each
Part Number: BTC-ANWRCH01B
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.425 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7425312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Springs, Beehive, Single, 0.550 in. Maximum Valve Lift, 372 lbs./in. Spring Rate, 1.280 in. Coil Bind Height, Set of 16
Part Number: BTC-BTR9112016
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, 400+ Street Strip, 236 int., 0.636 in./0.636 in. Lift, 114 LSA, 3-Bolt, Gen III/IV LS, Each
Part Number: BTC-S0400
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.325 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7325312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, V2 Series, Hydraulic Roller, Turbocharged Use, Stage 3 Turbo, 224 Intake Duration, 0.618 in./0.618 in. Lift, Chevy, 4.8/5.3/6.0/6.2L, Each
Part Number: BTC-BTRTURBOSTG3
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, Stage 4 Truck V2, 224 int./230 exh. Duration, 0.553 in./0.553 in. Lift, 109 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR32430090
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Springs, Beehive, Single, 0.625 in. Maximum Valve Lift, 294 lbs./in. Spring Rate, 1.295 in. Coil Bind Height, Set of 16
Part Number: BTC-SP02116
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.