Availability
Brian Tooley Racing Parts and Accessories
Rocker Arms, BTR TK002 Trunnion, LS3, Assembled, Steel, 1.7 Ratio, Chevy, Set of 16
Part Number: BTC-BTRLS3TK002
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR LS TRUCK STAGE 3 CAMSHAFT V3
Part Number: BTC-S0577
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR GEN V STAGE 2 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0413
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR ROCKER ARMS WITH TK001 TRUNNION WITHOUT BOLTS
Part Number: BTC-BTRLS1TK001
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, Gen V 225 Cam, 225 int./225 exh. Duration, 0.644 in./0.644 in. Lift, 113 LSA, 1-Bolt, 6.2L, Each
Part Number: BTC-BTRGENV225
Not Yet Reviewed
Estimated Ship Date: Feb 16, 2026 if ordered today
Estimated Ship Date: Feb 16, 2026 if ordered today
Valve Spring Kit, Platinum, Dual, Standard, Steel Retainer, 0.060 in. Thick, 377 lbs./in., Bronze Valve Guides, Kit
Part Number: BTC-SK001S6560BB
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR 400+ MEDIUM TWIN TURBO CAMSHAFT
Part Number: BTC-BTR-MTT400
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, Truck Norris, 21X int./22X exh. Duration, 0.540 in./0.540 in. Lift, 111 LSA, 1-Bolt, 5.3L, Gen V LT, Each
Part Number: BTC-BTR-GENV53TN
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR GEN V STAGE 3 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0414
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, LS7 Stage 4 V2, 246 int./260 exh. Duration, 0.662 in./0.662 in. Lift, 111 LSA, 3-Bolt, 7.0L, Each
Part Number: BTC-BTRLS7STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, LS Truck Hoss Stroker, 219 int. Duration, 0.620 in./0.636 in. Lift, 112 LSA, 3-Bolt. Chevy, Gen III/IV LS, Each
Part Number: BTC-LSTRUCKHOSS
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft
Part Number: BTC-BTR-HOTROD
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, Truck Norris Cam, 212 int. Duration, 0.587 in./0.586 in. Lift, 109.5 LSA, 1-Bolt, 5.7L, Hemi Gen III, Each
Part Number: BTC-S0425
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, V2, Stage 4, Hydraulic Roller, 233/24X Duration at 0.050 in., 0.636 in. Lift, 111 LSA, 3-Bolt, Chevy, LS, Each
Part Number: BTC-BTRLS1STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR LS 400+ BIG TURBO CAMSHAFT
Part Number: BTC-BTR-LSBT400
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR LS 400+ MEDIUM TURBO CAMSHAFT
Part Number: BTC-BTR-LSMT400
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Spring Kit, Platinum, Dual, Standard, Steel Retainer, 0.045 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001S0545BB
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR 6.4 HEMI VALVE SPRING KIT
Part Number: BTC-SK024
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, Stage 1 V2 Twin Turbo, 218 int./23X exh. Duration, 0.618 in./0.618 in. Lift, 113 LSA, 3-Bolt, Chevy, LS, Each
Part Number: BTC-S0458
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR 6.4 GEN III HEMI 224 VVT CAMSHAFT
Part Number: BTC-S0462
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, LS7 Stage 2 V2, 230 int./250 exh. Duration, 0.650 in./0.650 in. Lift, 116 LSA, 3-Bolt, 7.0L, Each
Part Number: BTC-BTRLS7STAGE2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Silver Powdercoated, Textured, Brian Tooley Racing Logo, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA-02-SLVR
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Silver Powdercoated, Textured, No Logo, Without Coil Mounts, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA-03-SLVR
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, LS3 Stage 5 V2, 235 int./250 exh. Duration, 0.646 in./0.646 in. Lift, 111 LSA, 3-Bolt, 6.2L, Each
Part Number: BTC-BTRLS3STAGE5
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Red Powdercoated, Textured, Brian Tooley Racing Logo, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA-02-RED
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster