Availability
Brian Tooley Racing Engines & Components
Timing Gears, Cam Gear, 4-Pole, 3-Bolt, 58X, Iron, Chevy, LS, Each
Part Number: BTC-BTR86481
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.750 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7750312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Accessory Drive Systems, Serpentine, Alternator, Water Pump, Clockwise, Power Steering, AC, SD-7, With Pulley Covers, Natural Finish, Chevy, LS, Kit
Part Number: BTC-ACD-LS05
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.525 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7525312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR GEN V STAGE 2 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0413
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.275 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7275312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.875 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7875312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.850 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7850312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Springs, Platinum, Dual, 0.660 in. Maximum Valve Lift, 400 lbs./in. Spring Rate, 1.070 in. Coil Bind Height, Set of 16
Part Number: BTC-SP001-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.625 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7625312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Spring, Conical, 165 lbs. @ 1.875 in., 400 lbs. @ 1.225 in., 0.650 in. Max Lift, LT1/L86, Set of 16
Part Number: BTC-SK013
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.045 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0545BB
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arm, Non-roller, 1.7 Ratio, Steel, Natural, Chevrolet, Small Block LS, Each
Part Number: BTC-RKRLS17ER1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Fuel Rails, Equalizer Billet Aluminum Fuel Rail, for Equalizer 1 Intake, Black Anodized, Kit
Part Number: BTC-FRK-01
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR LS TRUCK STAGE 3 CAMSHAFT V3
Part Number: BTC-S0577
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.575 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7575312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, BTR, LS7 Stage 4 V2, 246 int./260 exh. Duration, 0.662 in./0.662 in. Lift, 111 LSA, 3-Bolt, 7.0L, Each
Part Number: BTC-BTRLS7STAGE4
Not Yet Reviewed
Estimated Ship Date: Mar 17, 2026 if ordered today
Estimated Ship Date: Mar 17, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.475 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7475312-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR LS3 STAGE 1 V2 CAMSHAFT
Part Number: BTC-BTRLS3STAGE1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.925 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7925375-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, BTR TK002 Trunnion, LS3, Assembled, Steel, 1.7 Ratio, Chevy, Set of 16
Part Number: BTC-BTRLS3TK002
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller, Street/Strip/Towing Use, L83 Stage 3, 215/233 Duration, 0.540 in./0.540 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2241533104R0
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 8.000 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR8000375-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrods, Assembled, One-Piece, 11/32 in. Diameter, 7.400 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7400343-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Roller Fulcrum, Shaft Mounting Style, 1.7 Ratio, Steel, Chevrolet, 6.2L, LS3, Kit
Part Number: BTC-S0447
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster