Availability
Fuel Sender Adapter, Adapts 5-Hole SAE (ATM-3262 Sender) To Early 6-Hole Collar
Part Number: ATM-3263
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Adapter, Heater Hose, 0.75 in., Each
Part Number: ATM-2281
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Cobalt, Fuel Level, Programmable, Empty/Full, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-6114
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge Pod, Triple 2 1/16 in., Black ABS, Chevy, Pontiac, Hard Top, Each
Part Number: ATM-12201
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
AutoMeter remembers its roots---and they go back to 1957. This vintage-look T-shirt features branding...
$36.99
—
$42.99
Gauge, Carbon Fiber, Oil Pressure, 0-100 psi, 2 5/8 in., Analog, Electrical, Each
Part Number: ATM-4827
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
LED Replacement Bulb, White, Set of 5
Part Number: ATM-3288-K
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Traditional Chrome, 2 1/16 in., Hourmeter, 0-99,999.9 Hours, 8-32 DC V, Black Face, Electrical, Each
Part Number: ATM-2587
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Sport-Comp, Water Temperature, 50-115 Degrees C, 2 1/16 in., Analog, Mechanical, Each
Part Number: ATM-3332-M
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge Pod, Pillar, Single, 2 1/16 in., Black, Full Pillar Coverage, Chevy, GMC, Each
Part Number: ATM-17119
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Phantom II, Oil Pressure, 0-100 psi., 2 5/8 in., Analog, Mechanical, Each
Part Number: ATM-7821
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Ultra-Lite, Metric Water Temperature, 40-120 Degrees C, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-4337M
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Speedometer, Sport-Comp, 0-160 mph, 5 in., Analog, Mechanical, Each
Part Number: ATM-3995
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, AirDrive, Air/Fuel Ratio, 8:1-18:1 Air/Fuel Ratio, 2 1/16 in., Black, Analog, Each
Part Number: ATM-9178-T
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauges, Antique Beige, Speedometer, Water Temperature, Oil Pressure, Fuel Level, Beige Face, Analog, Kit
Part Number: ATM-1850
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Ultra-Lite, Boost/Vacuum, 30 in. Hg/30 psi, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-4377
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge Panel, Direct-Fit, ABS Plastic, Black, Four 2 1/16 in. Holes, Two 3 3/8 in. Holes, Dodge, Plymouth, A-Body, Each
Part Number: ATM-2141
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Phantom, Oil Temperature, 140-280 Degrees F, 2 1/16 in., Analog, Mechanical, Each
Part Number: ATM-5741
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Carbon Fiber, Fuel Level, Empty/Full, 0 Ohms/90 Ohms, 2 5/8 in., Analog, Electrical, Each
Part Number: ATM-4814
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Sport-Comp II, Chevy Red Bowtie Emblem, Oil Pressure, 0-100 psi, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-3627-00406
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Antique Beige, Water Temperature, 100-250 Degrees F, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-1837
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Factory Match, Analog, Transmission Temperature, 100-260 degrees F, 2 1/16 in., Black Face, Each
Part Number: ATM-8357
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Designer Black, Fuel Level, Empty/Full, 0 Ohms/30 Ohms, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-1425
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge, Phantom II, Water Temperature, 100-250 Degrees F, 2 1/16 in., Analog, Electrical, Each
Part Number: ATM-7537
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Gauge Panel, Direct-Fit, Instrument Cluster, Black, Plastic, Two 5 in. Holes, Four 2 1/16 in. Holes, Chevrolet, Each
Part Number: ATM-2910
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.