Availability
Bolts, 12-Point Head, Chromoly Steel, Black Oxide, 8mm x 1.25 RH Thread, 25mm UHL, Set of 5
Part Number: ARP-671-1002
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Wheel Studs, Press-In, 0.554 in. Knurl, 1/2-20 in. RH Thread, Ford Mustang II, Front, Set of 5
Part Number: ARP-100-7714
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Stainless 300, Polished, 3/8 in.-16 RH Thread, 3.000 in. UHL, Set of 5
Part Number: ARP-613-3000
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Cylinder Head Bolts, Pro Series, 12-Point Head, Chevy, 4.8, 5.3, 6.0L, 2004 and Newer, Kit
Part Number: ARP-134-3710
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Pressure Plate Bolts, Hex Head, Chromoly Steel, Black Oxide, Ford, 5.0L, Kit
Part Number: ARP-150-2202
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Stainless 300, Polished, 5/16 in.-18 RH Thread, 3.250 in. UHL, Set of 5
Part Number: ARP-612-3250
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Water Pump Bolts, 12-Point, Stainless Steel, Long Pump, Chevy, Small Block, Big Block, Kit
Part Number: ARP-430-3201
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Main Studs, 4-Bolt Main, Large Journal, with Windage Tray, Chevy, Small Block, Kit
Part Number: ARP-234-5610
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Nuts, 12-Point, Custom 450, Black Oxide, 5/8 in.-18 RH Thread, Set of 10
Part Number: ARP-300-8339
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm Nuts, 12-Point, Roller Rockers, 7/16 in.-20 Thread, .600 in. Outside Diameter, Set of 16
Part Number: ARP-300-8246
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Thread Cleaning Chaser, 8-1.25mm Thread Pitch, Steel, Each
Part Number: ARP-912-0001
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Cylinder Head Studs, Pro Series, 12-Point Nuts, 7/16 in. Threads, Ford, 289-302, Kit
Part Number: ARP-154-4201
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Custom 450, Black Oxide, 3/8 in.-16 RH Thread, 1.750 in. UHL, Set of 5
Part Number: ARP-642-1750
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, Hex Head, Stainless 300, Polished, 3/8 in.-16 RH Thread, 1.250 in. UHL, Set of 5
Part Number: ARP-623-1250
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Main Studs, 2-Bolt Main, Oldsmobile, 455, Kit
Part Number: ARP-185-5401
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Flywheel Bolts, High Performance, Chromoly, Black Oxide, 12-point, 10mm x 1, Ford, 2.0L, Set of 6
Part Number: ARP-151-2801
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Stainless 300, Polished, 3/8 in.-16 RH Thread, 2.500 in. UHL, Set of 5
Part Number: ARP-613-2500
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Main Bolts, High Performance Series, 2-Bolt Main, Small Journal, Chevy, Small Block, Kit
Part Number: ARP-134-5002
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Custom 450, Black Oxide, 3/8 in.-16 RH Thread, 1.500 in. UHL, Set of 5
Part Number: ARP-642-1500
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Main Studs, Side Bolts, 12-Point Head, Ford, 4.6L, Kit
Part Number: ARP-156-5202
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Cover and Aluminum Water Pump Bolts, Chromoly, Black Oxide, 12-Point Hex Head, Ford, 289, 302, Kit
Part Number: ARP-154-1503
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, Hex Head, Stainless 300, Polished, 3/8 in.-16 RH Thread, 1.000 in. UHL, Set of 5
Part Number: ARP-623-1000
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Bolts, 12-Point Head, Stainless 300, Polished, 10mm x 1.5 RH Thread, 30mm UHL, Set of 5
Part Number: ARP-772-1003
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Cylinder Head Bolts, High Performance, Hex Head, Dodge, 5.2, 5.9L, Edelbrock Performer RPM Heads, Kit
Part Number: ARP-144-3605
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Starter Bolts, 3/8 in.-16 x 3.700 in., 12 pt. Head, for Full Size Starter, 7/16 in. Socket/Wrench, Stainless, Polished, Chevy, Big/Small Block, Pair
Part Number: ARP-430-3501
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.