Summit Racing™ Mechanical Fuel Pumps SUM-250000-1

Summit Racing™ Mechanical Fuel Pumps SUM-250000-1

SUM-250000-1

3.75 out of 5 stars ( 125 )

Part Number: SUM-250000-1

Estimated Ship Date: Monday 10/26/2026

$65.99

Results 1 - 6 of 6

Hose, Fuel, Emission, Hysunite Rubber, Black, 3/8 in. I.D., 25 ft. Length, 50 psi, Each

Part Number: CEL-65128

4.55 out of 5 stars ( 11 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fuel Line Hose, Nitrile Rubber, Black, 3/8 in. I.D., 50 ft. Length, Each

Part Number: DAC-80064

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fuel Pump Pushrod, Chevy, Each

Part Number: RNB-03875

3.4 out of 5 stars ( 10 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fuel Line Hose, Nitrile Rubber/Neoprene, Black, 3/8 in. I.D., 25 ft. Length, Each

Part Number: DAC-80063

4.38 out of 5 stars ( 40 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Grease, Wheel Bearing, 15 oz., Each

Part Number: TMK-GR224TUB

4.78 out of 5 stars ( 37 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Fitting, Adapter, NPT to Hose Barb, 90 Degree, Brass, Natural, 1/4 in. NPT, 3/8 in. Hose Barb, Each

Part Number: RNB-785-430

4.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

  • 1
  • Page 1 of 1
Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.

Call now to speak with a sales specialist!

Call Now!

1-800-230-3030