Superlift Lift Leaf Springs 01-235-6

Superlift Lift Leaf Springs 01-235-6

SLF-01-235-6

4.5 out of 5 stars ( 13 )

Part Number: SLF-01-235-6

Estimated Ship Date from OH, NV, GA: Monday 10/26/2026

$149.99

Results 1 - 6 of 6

Pit Mat, Red, Foam Padding, Vinyl Exterior, Fold Out, Handles, Summit Racing Equipment® Logo, Script-Style, Each

Part Number: SUM-G1028

4.93 out of 5 stars ( 234 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Jack Stands, 3-Tons Combined, Steel, Silver Hammertone Powdercoat, Pair

Part Number: SUM-918012

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Assembly Lubricant, Polyurethane Bushing Installation, 8 oz., Each

Part Number: SUM-G7738

5.0 out of 5 stars ( 15 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Creeper, Blue, Steel Frame, 250 Lbs. Capacity, Each

Part Number: SUM-G1069-BLU

3.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Creeper, Black, Steel Frame, 250 Lbs. Capacity, Each

Part Number: SUM-G1069-BLK

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Creeper, Red, Steel Frame, 250 Lbs. Capacity, Each

Part Number: SUM-G1069-RED

Not Yet Reviewed

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

  • 1
  • Page 1 of 1
Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.