Skyjacker Nitro Shocks N8079

Skyjacker Nitro Shocks N8079

SJA-N8079

5 out of 5 stars ( 6 )

Part Number: SJA-N8079

Estimated Ship Date from OH, NV, GA: Monday 11/2/2026

$61.61

Results 1 - 10 of 10

Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each

Part Number: RAN-RS55112

4.64 out of 5 stars ( 11 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Assembly Lubricant, Formula Five Prelube, for Polyurethane Bushing Installation, 8 oz., Each

Part Number: ENS-9-11104

4.97 out of 5 stars ( 68 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Shock, 5125 Series, Monotube, Lifted, 4-6 w/Double Shock, Ford, Each

Part Number: BSN-33-104645

4.8 out of 5 stars ( 5 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Assembly Lubricant, Polyurethane Bushing Installation, 8 oz., Each

Part Number: SUM-G7738

5.0 out of 5 stars ( 15 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Shocks and Struts, Nitro Series, Twin-Tube, Red Boot, Rear, Dodge, Ram, Ford, Each

Part Number: SJA-N8041

4.69 out of 5 stars ( 13 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Assembly Lubricant, Formula Five Prelube, for Polyurethane Bushing Installation, 1/2 oz., Set of 3

Part Number: ENS-9-11110

4.83 out of 5 stars ( 30 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Shock, Stabilizer Boot, Polyurethane, Red, Each

Part Number: SJA-B10R

4.94 out of 5 stars ( 17 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Shock, Stabilizer Boot, Polyurethane, Black, Each

Part Number: SJA-B10K

4.5 out of 5 stars ( 22 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Shock/Strut, Monotube, Polyurethane Bushings, 26.070 in. Extended Length, 15.570 in. Collapsed Length, Each

Part Number: SJA-M9541

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Shock/Strut, Nitro 8000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each

Part Number: SJA-N8053

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

  • 1
  • Page 1 of 1
Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.