Recommended Parts for EDL-2701-CP
Filters
Thermostat, 180 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-180
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Thermostat, 160 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-160
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Water Neck, Cast Aluminum, Polished, O-Ring, 45-Degree, Chevy, Big/Small Block, Each
Part Number: SUM-371100
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Hose Fitting, 5/8 in. Hose Barb to 1/2 in. NPT Male Threads, 90-Degree, Stainless Steel, Natural, Each
Part Number: SUM-221104
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Hose Fitting, 5/8 in. Hose Barb to 1/2 in. NPT Male Threads, 45-Degree, Stainless Steel, Natural, Each
Part Number: SUM-221106
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Hose Fitting, 5/8 in. Hose Barb to 1/2 in. NPT Male Threads, 6-Point, Stainless Steel, Natural, Each
Part Number: SUM-221102
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Thermostat, 195 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-195
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Estimated Ship Date: Monday 10/26/2026 if shipped by air
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster