Edelbrock Ford Flathead Intake Manifolds 1109

Edelbrock Ford Flathead Intake Manifolds 1109

EDL-1109

Not Yet Reviewed

Part Number: EDL-1109

Estimated Ship Date: Oct 28, 2026

$538.95

Results 1 - 9 of 9

Pipe Plugs, Stainless Steel, Allen Head, Two 1/8 in. NPT, Two 1/4 in. NPT, Two 1/2 in. NPT, Two 3/8 in. NPT, Kit

Part Number: SUM-921010

4.71 out of 5 stars ( 21 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fittings, Pipe Plug Kit, Internal Allen Head, 1/8", 1/4" 3/8", 1/2", NPT, Steel, Zinc Plated, Set of 8

Part Number: EDL-8052

4.88 out of 5 stars ( 26 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fittings, Pipe Plug Kit, Internal Allen Head, Two Each of 1/8 in., 1/4 in., 3/8 in., 1/2 in, NPT, Aluminum, Black Anodized, Set of 8

Part Number: SUM-921015

4.33 out of 5 stars ( 6 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Fittings, Pipe Plugs, Steel, Black, Assortment, Hex Head, Set of 8

Part Number: EDL-8051

4.33 out of 5 stars ( 15 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Carburetor, Stromberg BIG97, 250 CFM, Primary, 2-Barrel, Original Finish, Manual Choke, Kit

Part Number: SBC-9510-B-P

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Carburetor, Stromberg 97, 2-barrel, Single Inlet, Manual Choke, Each

Part Number: SBC-9510A-VP

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Pipe Plugs, Steel, Chrome, Allen Head, 1/8 in., 1/4 in., 3/8 in., 1/2 in. Kit

Part Number: SPE-60183

3.75 out of 5 stars ( 4 )

Estimated Ship Date: Monday 10/26/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 10/26/2026 if shipped by air

Throttle Linkage, TwoStep, Three 2-barrel, Stromberg, Kit

Part Number: SBC-9245PRO

Not Yet Reviewed

Estimated Ship Date: Nov 17, 2026 if ordered today

...Loading

Estimated Ship Date: Nov 17, 2026 if ordered today

Throttle Linkage, TwoStep, Three 2-barrel, Stromberg, Kit

Part Number: SBC-9245S

Not Yet Reviewed

Estimated Ship Date: Nov 17, 2026 if ordered today

...Loading

Estimated Ship Date: Nov 17, 2026 if ordered today

  • 1
  • Page 1 of 1
Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.

Call now to speak with a sales specialist!

Call Now!

1-800-230-3030