Availability
Engine Assemblies
Crate Engine, Long Block, Chevy Gen III LS, 24x Crank Reluctor, Aluminum Heads, Each
Part Number: SUM-150153
Estimated Ship Date: Dec 10, 2026
Estimated Ship Date: Dec 10, 2026
Crate Engine, GM 350 Small Block Stage 3, 290 HP, Hydraulic Roller Long Block, External/Internal Balance, Vortec Cylinder Heads, Carburetor, Each
Part Number: HPE-HP99C
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Crate Engine, Base Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each
Part Number: HPE-HP98
Estimated Ship Date: Dec 28, 2026 if shipped by air
Estimated Ship Date: Dec 28, 2026 if shipped by air
Engine Assembly, Stage 2 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32M
Estimated Ship Date: Oct 26, 2026 if shipped by air
Estimated Ship Date: Oct 26, 2026 if shipped by air
Crate Engine, Ford 302 Stock Drop In, Long Block, Assembled, External Balance, Cast Iron Cylinder Heads, Each
Part Number: HPE-HP99F
Estimated Ship Date: Dec 28, 2026 if shipped by air
Estimated Ship Date: Dec 28, 2026 if shipped by air
Crate Engine, Assembly, Stage 1, Long Block, 1-Piece RMS, 4-Bolt Mains, Cast Iron w/Aluminum Heads, Hydraulic Roller, 10:1 CR, Chevy, Gen I 350, Each
Part Number: HPE-HP89
Estimated Ship Date: Oct 26, 2026 if ordered today
Estimated Ship Date: Oct 26, 2026 if ordered today
Engine Assembly, Stage 1 Crate Engine, Long Block, Ford, Small Block, 302, Each
Part Number: HPE-HP79
Estimated Ship Date: Oct 26, 2026 if shipped by air
Estimated Ship Date: Oct 26, 2026 if shipped by air
Engine Assembly, Stage 2 Crate Engine, Long Block, Ford, Small Block, 302, Each
Part Number: HPE-HP79M
Estimated Ship Date: Oct 26, 2026 if ordered today
Estimated Ship Date: Oct 26, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
ATK High Performance Ford 302 300 HP Stage 1 Long Block Crate Engines for 1969-1970 COUGAR, 1969-1971 MUSTANG - HP79
Estimated Ship Date: Oct 26, 2026
Crate Engine, Vortec, GM 350, 315 HP, Long Block, Internal Front/External Rear Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP74
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP31
Estimated Ship Date: Jan 25, 2027 if shipped by air
Estimated Ship Date: Jan 25, 2027 if shipped by air
Engine Assembly, Stage 2 Crate Engine, Long Block, Left Side Water Pump Inlet, Ford, Small Block, 302, Each
Part Number: HPE-HP06M
Estimated Ship Date: Jan 25, 2027 if shipped by air
Estimated Ship Date: Jan 25, 2027 if shipped by air
Crate Engine, Marine, 350 C.I.D. 260 HP, Long Block, Assembled, Block Casting 880, Each
Part Number: HME-VMH4
Estimated Ship Date: Oct 26, 2026 if shipped by air
Estimated Ship Date: Oct 26, 2026 if shipped by air
Crate Engine, GM 383 Stroker Stage 1, Long Block, Internal/External Engine Balance, Aluminum Heads, Each
Part Number: HPE-HP94
Estimated Ship Date: Oct 26, 2026 if shipped by air
Estimated Ship Date: Oct 26, 2026 if shipped by air
Crate Engine, GM 350, Stage 1, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291P
Estimated Ship Date: Jan 25, 2027 if shipped by air
Estimated Ship Date: Jan 25, 2027 if shipped by air
Crate Engine, Mopar 360 Small Block Stage 1, 320 hp, 410 lbs.-ft. Torque, Long Block, Hydraulic Roller, External Engine Balance, Magnum Heads, Each
Part Number: HPE-HP73
Estimated Ship Date: Dec 2, 2026
Estimated Ship Date: Dec 2, 2026
Crate Engine, Chevy LQ4 6.0L, Long Block, Internal Engine Balance, Aluminum Heads, Each
Part Number: HPE-HP93
Estimated Ship Date: Jan 25, 2027 if shipped by air
Estimated Ship Date: Jan 25, 2027 if shipped by air
Engine Assembly, Stage 3 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32C
Estimated Ship Date: Jan 18, 2027 if ordered today
Estimated Ship Date: Jan 18, 2027 if ordered today
Need It Sooner? We recommend these similar substitute parts:
ATK High Performance GM 350 Vortec 315 HP Stage 1 Long Block Crate Engines HP74
Estimated Ship Date: Dec 14, 2026
Crate Engine, Performance, Complete Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, 4-Bolt Main, Internal/External Balance, Chevy, 350, Each
Part Number: HPE-HP98C
Estimated Ship Date: Oct 26, 2026 if ordered today
Estimated Ship Date: Oct 26, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
ATK High Performance GM 350 345 HP Stage 1 Long Block Crate Engines HP98
Estimated Ship Date: Dec 28, 2026
Crate Engine, Shortblock Plus 383, 350 Stroker Motor, SBC, New BluePrint Block, Roller Cam, Oil Pan, Balancer
Part Number: MLL-BP38318SP
Estimated Ship Date: Nov 9, 2026 if shipped by air
Estimated Ship Date: Nov 9, 2026 if shipped by air
Crate Engines, Chrysler 5.7L Gen III Hemi 400 HP Long Block, 5.7L/345, Assembled, Aluminum Heads, without MDS, Chrysler, Dodge, Jeep, 5.7L, Each
Part Number: HPE-HP103T
Estimated Ship Date: Nov 18, 2026
Estimated Ship Date: Nov 18, 2026
Crate Engine, GM 5.3L, LM7, 385 HP, Long Block, Internal Engine Balance, Aluminum Heads, Each
Part Number: HPE-HP97
Estimated Ship Date: Jan 18, 2027 if shipped by air
Estimated Ship Date: Jan 18, 2027 if shipped by air
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32
Estimated Ship Date: Jan 25, 2027 if shipped by air
Estimated Ship Date: Jan 25, 2027 if shipped by air
Engine Assembly, Stage 1 Crate Engine, Long Block, Ford, Small Block, 302, Each
Part Number: HPE-HP06
Estimated Ship Date: Apr 14, 2027
Estimated Ship Date: Apr 14, 2027
Crate Engine, GM 350, Stage 3, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291PC
Estimated Ship Date: Jan 22, 2027
Estimated Ship Date: Jan 22, 2027
Crate Engine, Ford Truck 302 Stock Drop-In Long Block, Remanufactured, Assembled, External, 50 oz. Imbalance, Cast Iron Heads, Ford, 302 Windsor, Each
Part Number: HPE-HP99FT
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2026
Estimated Ship Date: Dec 2, 2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster