Availability
84 Results Found For "Summit Racing Premium Battery Relocation Kits"
Showing In Stock Items. Show All 99 Items.
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp-down, GM V8, Kit
Part Number: SUM-G5226BLK
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
BUILD IT WITH SUMMIT!
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp-Down, Summit, Mopar, V8, Kit
Part Number: SUM-G5239
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Female/Socket, Brass Terminals, Clamp-Down, Ford, V8, Kit
Part Number: SUM-G5208
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Black, Female/Socket, Brass Terminals, Clamp-Down, AMC, GM, V8, Kit
Part Number: SUM-G5223BK
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Dodge, 5.2, 5.9L, Kit
Part Number: SUM-G5233
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw Down, Jeep, 4.0L, Kit
Part Number: SUM-G5230
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Clamp-Down, Ford, 5.0, 5.8L, Kit
Part Number: SUM-G5227
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Clear, Male/HEI, Brass Terminals, Clamp-Down, GM, Checker, V8, Kit
Part Number: SUM-G5236
Estimated Ship Date: Dec 18, 2026
Estimated Ship Date: Dec 18, 2026
Cap and Rotor, Maroon, Female/Socket, Brass Terminals, Clamp-Down, AMC, GM, V8, Kit
Part Number: SUM-G5223
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Chevy, 5.0, 5.7, 7.4L, Kit
Part Number: SUM-G5224
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Tan, Female/Socket, Brass Terminals, Clamp-Down, Mopar, Summit, V8, Kit
Part Number: SUM-G5244
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Female/Socket, Brass Terminals, Clamp-Down, Chrysler, Dodge, Plymouth, 5.2, 5.9L.Kit
Part Number: SUM-G5232
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Screw-Down, Summit, V8, Kit
Part Number: SUM-G5246
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Red, Male/HEI, Brass Terminals, Screw-Down, Summit, V8, Kit
Part Number: SUM-G5246R
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Buick, Cadillac, Chevy, GMC, Oldsmobile, Pontiac, V8, Kit
Part Number: SUM-G5234BK
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Maroon, Male/HEI, Brass Terminals, Buick, Cadillac, Chevy, GMC, Oldsmobile, Pontiac, V8, Kit
Part Number: SUM-G5234
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap & Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Cadillac, Chevy, GMC, Oldsmobile, Pontiac, 4.3L V6
Part Number: SUM-G5221
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Clamp-Down, GM V8, Kit
Part Number: SUM-G5226
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Cap and Rotor, Blue, Male/HEI, Brass Terminals, Screw-Down, Dodge, 3.9L, V6, Kit
Part Number: SUM-G5229
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Block Protector, Steel, Roller, Chevy, Big Block, Kit
Part Number: SME-1791
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Disconnect Switch, Manual, Rotary, 12V, 100 Continuous Amps Rating, 500 Surge Amp Rating, Each
Part Number: SUM-830054
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Charging Post Bracket Kit, Includes Charging posts and Bracket, Remote Battery Jumper Terminals and Bracket, Kit
Part Number: SUM-900396
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Hold Down Kit, Reproduction, 1972-1993 Dodge Truck, OE Style, 5 Piece Kit
Part Number: SUM-RP80497
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Positive, 2-Gauge, Red, Top Post and Eyelet, 56 in. Length, Each
Part Number: SUM-BCXTP256R
Estimated Ship Date: Dec 28, 2026 if shipped by air
Estimated Ship Date: Dec 28, 2026 if shipped by air
Portable Charger, Rechargeable, Lithium Ion Battery, USB, Apple, Micro-USB, Case, Kit
Part Number: SUM-P177
Cannot be shipped Internationally
Cannot be shipped Internationally
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster