Availability
37 Results Found For "Summit Racing Premium Battery Relocation Kits"
Showing In Stock Items. Show All 41 Items.
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp Down, Summit, MSD, Chevy, Kit
Part Number: SUM-G5245
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
BUILD IT WITH SUMMIT!
Block Protector, Steel, Roller, Chevy, Small Block, Kit
Part Number: SME-1790
Not Yet Reviewed
Estimated Ship Date: Jan 28, 2027
Estimated Ship Date: Jan 28, 2027
Cap and Rotor, Red, Male/HEI, Brass Terminals, Clamp Down, Summit, MSD, Chevy, Kit
Part Number: SUM-G5245R
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Starter Rebuild Parts and Components, Terminal Conversion, 90 Degree, Denso Style, Each
Part Number: SUM-820442
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Hold-Down, J-Bolts and T-Style Wing Nuts with Washers, 3/16 in. x 10 in., Universal, Each
Part Number: SUM-G1202
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Positive, 2-Gauge, Red, Top Post and Eyelet, 15 in. Length, Each
Part Number: SUM-BCXTP215R
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Negative, 4-Gauge, Black, Top Post and Eyelet, 15 in. Length, Each
Part Number: SUM-BCXTP415BK
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Negative, 4-Gauge, Black, Top Post and Eyelet, 20 in. Length, Each
Part Number: SUM-BCXTP420BK
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Negative, 4-Gauge, Black, Top Post and Eyelet, 12 in. Length, Each
Part Number: SUM-BCXTP412BK
Not Yet Reviewed
Estimated Ship Date: Jan 18, 2027 if shipped by air
Estimated Ship Date: Jan 18, 2027 if shipped by air
Battery Cable, Switch to Starter, 4-Gauge, Red, 32 in. Length, Eyelet Ends, Each
Part Number: SUM-BCXSS432R
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Positive, 4-Gauge, Red, Top Post and Eyelet, 12 in. Length, Each
Part Number: SUM-BCXTP412R
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if shipped by air
Estimated Ship Date: Jan 4, 2027 if shipped by air
Battery Cable, Negative, 4-Gauge, Black, Top Post and Eyelet, 25 in. Length, Each
Part Number: SUM-BCXTP425BK
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Switch to Starter, 4-Gauge, Black, 10 in. Length, Eyelet Ends, Each
Part Number: SUM-BCXSS410BK
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Switch to Starter, 4-Gauge, Black, 19 in. Length, Eyelet Ends, Each
Part Number: SUM-BCXSS419BK
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Negative, 2-Gauge, Black, Top Post and Eyelet, 15 in. Length, Each
Part Number: SUM-BCXTP215BK
Estimated Ship Date: Jan 18, 2027 if shipped by air
Estimated Ship Date: Jan 18, 2027 if shipped by air
Battery Cable, Switch to Starter, 4-Gauge, Red, 10 in. Length, Eyelet Ends, Each
Part Number: SUM-BCXSS410R
Not Yet Reviewed
Estimated Ship Date: Jan 4, 2027 if shipped by air
Estimated Ship Date: Jan 4, 2027 if shipped by air
Battery Cable, Switch to Starter, 4-Gauge, Black, 24 in. Length, Eyelet Ends, Each
Part Number: SUM-BCXSS424BK
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Positive, 4-Gauge, Red, Top Post and Eyelet, 20 in. Length, Each
Part Number: SUM-BCXTP420R
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Cable, Positive, 4-Gauge, Red, Top Post and Eyelet, 15 in. Length, Each
Part Number: SUM-BCXTP415R
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Junction Block, Red {+} Pos, M10 Stud W/Nut, Designed For Relocating Frequently Accessed Wire To Accesories, Relocated Batteries, OEM Style,EA
Part Number: SUM-RP24919
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Tray, Steel, EDP Coated, 1970-81 Chevy Camaro, Each
Part Number: SUM-RP100003
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Valve Cover Gasket Set, GM, Chevy, GEN III/IV LS, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Pair
Part Number: SUM-G2603
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Tray, Steel, EDP Coated, 1968-72 Chevy Chevelle and El Camino, 1970-72 Monte Carlo, Passenger Car, Each
Part Number: SUM-RP100002
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Battery Tray, Steel, EDP Coated, 1967-69 Chevy Camaro, 1966 Chevelle and El Camino, 1967-69 Pontiac Firebird, Each
Part Number: SUM-RP100001
Not Yet Reviewed
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Estimated Ship Date: Monday 11/30/2026 if shipped by air
Flywheel Hardware Kit, 1964-74 Mopar, 383/440, Manual Transmission, OE Style Fasteners, 6 Piece Kit
Part Number: SUM-RP80580
Not Yet Reviewed
Estimated Ship Date: Friday 12/4/2026
Estimated Ship Date: Friday 12/4/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster