Availability
JEEP 2.5L/150 Parts and Accessories
Showing In Stock Items. Show All 400 Items.
Fuel Pump, Electric, In-Tank, EFI, OEM-Style, 58 psi, 255 lph, Gasoline, for Models with 15-Gallon Fuel Tank and non-PWM Aftermarket EFI, Jeep, Each
Part Number: SNE-12-307
Not Yet Reviewed
Estimated Ship Date: Nov 18, 2026
Estimated Ship Date: Nov 18, 2026
BUILD IT WITH SUMMIT!
Disc Brake Kit, Rear Conversion, Jeep, 1984-2004, Cast Iron Calipers, Kit
Part Number: SUM-BK3009
Not Yet Reviewed
Estimated Ship Date: Dec 21, 2026 if shipped by air
Estimated Ship Date: Dec 21, 2026 if shipped by air
Differential, Eaton Detroit Truetrac, Limited Slip, 30-Spline, 3.73:1 and Down Only, Dana 44, Each
Part Number: ETN-913A589
Estimated Ship Date: Dec 23, 2026
Estimated Ship Date: Dec 23, 2026
Disc Brakes, Conversion, Rear, Solid Surface Rotors, 1-piston Calipers, Parking Brake, Jeep, Kit
Part Number: RTO-RT31007
Estimated Ship Date: Jan 6, 2027
Estimated Ship Date: Jan 6, 2027
Gauge Kit, CJ Jeep Series, Analog, 5 1/2 in. Diameter, Speedometer, Tachometer, Water Temperature, Fuel Level, Black Face, White Letters, Kit
Part Number: SDU-CJ55-QG1
Estimated Ship Date: Nov 23, 2026 if shipped by air
Estimated Ship Date: Nov 23, 2026 if shipped by air
Differential, Eaton Detroit Truetrac, 27-Spline, Dana 30, Each
Part Number: ETN-912A585
Estimated Ship Date: Dec 22, 2026
Estimated Ship Date: Dec 22, 2026
Bellhousing, External Hydraulic Upgrade, Release Bearing and Lever, Slave Cylinder, Bearing Retainer, Hardware, Jeep, AX15, Kit
Part Number: ADD-712590-IR
Estimated Ship Date: Nov 9, 2026 if shipped by air
Estimated Ship Date: Nov 9, 2026 if shipped by air
Gauge Kit, CJ Jeep GPS Speedometer Cluster Gauge Kit, OEM Replacement, Analog, Tach, Water Temperature, Black Face, White Numbers, Jeep, Each
Part Number: SDU-CJ55-QG2
Estimated Ship Date: Nov 17, 2026
Estimated Ship Date: Nov 17, 2026
Differential, Eaton Detroit Truetrac, Limited Slip, 30-Spline, 3.92:1 and Up Only, Dana 44, Each
Part Number: ETN-913A590
Estimated Ship Date: Dec 3, 2026
Estimated Ship Date: Dec 3, 2026
Radiators, Downflow, 3-row, Aluminum, Natural, Transmission Cooler, Jeep, Each
Part Number: FBR-FB234
Estimated Ship Date: Dec 11, 2026
Estimated Ship Date: Dec 11, 2026
Ring and Pinion Gears and Installation Kit Combo, 4.56:1 Ratio, Dana 30 Front, AMC Model 35 Rear, Jeep, Kit
Part Number: YGA-31001
Not Yet Reviewed
Estimated Ship Date: Nov 27, 2026
Estimated Ship Date: Nov 27, 2026
Ring and Pinion Gears and Installation Kit Combo, 4.56:1 Ratio, Dana 30 Front, AMC Model 35 Rear, Jeep, Kit
Part Number: YGA-31005
Not Yet Reviewed
Estimated Ship Date: Nov 27, 2026
Estimated Ship Date: Nov 27, 2026
Fuel Pumps, Electric, In-Tank, EFI, OEM-Style, 58 psi, 350 lph, Gasoline, Jeep, Each
Part Number: SNE-12-377
Estimated Ship Date: Nov 16, 2026 if shipped by air
Estimated Ship Date: Nov 16, 2026 if shipped by air
Axle Shaft Kit, Long Axles, Rear, 1541H, Bolt in, 29 Spline, Jeep, Kit
Part Number: YGA-21391
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2026
Estimated Ship Date: Nov 24, 2026
Ring and Pinion Gears and Installation Kit Combo, 4.56:1 Ratio, Dana 30 Front, Chrysler 8.25 in. Rear, Jeep
Part Number: YGA-31003
Estimated Ship Date: Nov 24, 2026
Estimated Ship Date: Nov 24, 2026
Suspension Lift, N3 Series, 2.50 in. Front, 2.50 in. Rear, Jeep, 4WD, Kit
Part Number: ROU-61030
Not Yet Reviewed
Estimated Ship Date: Nov 9, 2026 if ordered today
Estimated Ship Date: Nov 9, 2026 if ordered today
Headers, Twisted Steel, 4-1 One-piece, Tuned, Stainless Steel, Natural, 1 1/2 in. Primary Tube O.D., Dodge, Jeep, 2.5L, Kit
Part Number: AFE-48-46206
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2026
Estimated Ship Date: Dec 2, 2026
Ball Joint Delete, Gen 2, High Clearance for RCVs, Recessed Flat, Jeep, Set of 4
Part Number: AIO-BJD1103
Estimated Ship Date: Nov 27, 2026
Estimated Ship Date: Nov 27, 2026
Fuel Tank, 20 Gallons Capacity, Polyethylene, Black, Jeep, Each
Part Number: CWA-RT22002
Estimated Ship Date: Jan 14, 2027
Estimated Ship Date: Jan 14, 2027
Ring and Pinion Gears and Installation Kit Combo, 4.88:1 Ratio, Dana 30 Front, Dana 44 Rear, Jeep, Kit
Part Number: YGA-31008
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2026
Estimated Ship Date: Nov 24, 2026
Catalytic Converter, California Grade, Universal, Stainless Steel Case, 16.000 in. Overall Length, 2.250 in. Inlet/Outlet, Each
Part Number: MPE-339105
Not Yet Reviewed
Estimated Ship Date: Friday 10/30/2026
Estimated Ship Date: Friday 10/30/2026
Radiator, Aluminum, 3-Row, Polished, Downflow, Jeep, Each
Part Number: FBR-FB174
Estimated Ship Date: Feb 26, 2027
Estimated Ship Date: Feb 26, 2027
Differential Carrier, Dura Grip Positraction, Clutch-type, 27-spline, Nodular Iron, Dana 35, Each
Part Number: YGA-26055
Estimated Ship Date: Nov 24, 2026
Estimated Ship Date: Nov 24, 2026
Exhaust System, Cat-back, FlowFX, 409 Stainless Steel, Single Exit, Jeep, XJ, Kit
Part Number: FLO-717892
Estimated Ship Date: Nov 16, 2026 if shipped by air
Estimated Ship Date: Nov 16, 2026 if shipped by air
Gauge Kit, CJ Jeep Series, Analog, 5 1/2 in. Diameter, GPS Speedometer, Water Temperature, Fuel Level, Black Face, White Letters, Kit
Part Number: SDU-R55-TG3T-CJ
Not Yet Reviewed
Estimated Ship Date: Nov 16, 2026 if shipped by air
Estimated Ship Date: Nov 16, 2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster