Availability
JEEP 2.5L/150 Parts and Accessories
Crown Automotive Crankshaft Position Sensors for 1994-2000 CHEROKEE, 1997-2004 WRANGLER - 56027865AB
Crown Automotive Crankshaft Position Sensors for 1994-2000 CHEROKEE, 1997-2004 WRANGLER - 56027865AB
Sensor, Crankshaft Position, Jeep, Each
Part Number: CWA-56027865AB
Estimated Ship Date: Jan 15, 2027
Estimated Ship Date: Jan 15, 2027
Manual Transmission Input Bearing Retainer, Steel, Dodge, Jeep, Each
Part Number: CWA-5013306AA
Estimated Ship Date: Jan 14, 2027
Estimated Ship Date: Jan 14, 2027
Engine Oil, ESP, Synthetic, 5W-30, API SJ/SL/SM/SN/SN Plus/SP, 1 Quart, Sold as a Set of 6
Part Number: MOB-127568
Cannot be shipped Internationally
Cannot be shipped Internationally
Shock Absorber/Strut, Black MAX, Twin-Tube, Includes Black Boot, Each
Part Number: SJA-B8528
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Shock/Strut, Monotube, Polyurethane Bushings, 24.750 in. Extended Length, 14.540 in. Collapsed Length, Each
Part Number: SJA-M9556
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Axle Bearing, One Axle Bearing, One Seal, One Lock Ring, One Spacer, One Retaining Plate, Rear, AMC Model 20, Jeep, Kit
Part Number: MGR-MG20KIT
Not Yet Reviewed
Estimated Ship Date: Nov 19, 2026
Estimated Ship Date: Nov 19, 2026
U-Joint, Spicer 1310, Steel, Each
Part Number: YGA-42003
Estimated Ship Date: Nov 23, 2026 if shipped by air
Estimated Ship Date: Nov 23, 2026 if shipped by air
Axle Bearing, Outer, Rear, Retainer, Seal, Ring, Dana 35, Jeep, Kit
Part Number: CWA-83501451
Estimated Ship Date: Jan 14, 2027
Estimated Ship Date: Jan 14, 2027
Lug Nuts, Installation, Locking, Standard Head, Conical Seat, Bulge, Steel, Chrome, 1/2-20 RH in. Thread Size, Set of 20
Part Number: MCG-84550
Estimated Ship Date: Dec 15, 2026
Estimated Ship Date: Dec 15, 2026
Engine Oil, Synthetic, 5W30, HPS Street, 1 qt., Set of 6
Part Number: RPO-31530-6
Cannot be shipped Internationally
Cannot be shipped Internationally
Shock, SX8000, Twin-Tube, 22.5 in. Extended, 13.5 in. Collapsed Lengths, Stud, Eyelet, Each
Part Number: TFY-61232
Estimated Ship Date: Nov 17, 2026
Estimated Ship Date: Nov 17, 2026
Electric Fans, Pacesetter, 11 in. Diameter, Puller/Pusher, Each
Part Number: MAR-MP119K
Not Yet Reviewed
Estimated Ship Date: Feb 11, 2027
Estimated Ship Date: Feb 11, 2027
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55240
Estimated Ship Date: Nov 23, 2026 if shipped by air
Estimated Ship Date: Nov 23, 2026 if shipped by air
Axle Bearing, Outer, Rear, Seals, Retaining Ring and Retainer, AMC Model 20, Dana 44, Kit
Part Number: CWA-J8130510
Estimated Ship Date: Jan 18, 2027 if shipped by air
Estimated Ship Date: Jan 18, 2027 if shipped by air
Oxygen Sensor, Universal, Heated, Thread-In Mounting, Each
Part Number: DNP-234-4210
Estimated Ship Date: Nov 16, 2026 if shipped by air
Estimated Ship Date: Nov 16, 2026 if shipped by air
Differential Carrier Rebuild Kits and Spider Gears, Dana 30, Side Gears, Front, Open, 27-spline, 10-bolt, Dana 30, Dana 30 Jeep Wrangler JK, TJ, Kit
Part Number: SVL-10020714
Estimated Ship Date: Nov 17, 2026
Estimated Ship Date: Nov 17, 2026
Shock, NX2 Nitro Series, Twin-tube, Jeep, Front, 4WD, Lifted 2.5 in., Each
Part Number: BDX-BDS85910
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026
Estimated Ship Date: Dec 8, 2026
Brake Rotor, Replacement, Solid, Solid Surface, Steel, Zinc Plated, Jeep, Rear, Each
Part Number: TSB-23007AB1A
Not Yet Reviewed
Estimated Ship Date: Jan 7, 2027
Estimated Ship Date: Jan 7, 2027
Wheel Bearings, Premium Low Drag, Steel Roller Bearing, Bearing Races, Front Inner, Front Outer, Kit
Part Number: DPR-00710585BR
Estimated Ship Date: Nov 18, 2026
Estimated Ship Date: Nov 18, 2026
Wheel Hub, Front, Steel, Natural, Jeep, Each
Part Number: CWA-5363421H
Estimated Ship Date: Jan 15, 2027
Estimated Ship Date: Jan 15, 2027
Adapter, Oil Filter Bypass, Spin-On, Aluminum, Black, 3/4-16 in. Thread, 1/2 in. NPT Inlet/Outlet, Each
Part Number: EAR-1178ERL
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Shock/Strut, Hydro 7000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-H7088
Estimated Ship Date: Dec 14, 2026 if shipped by air
Estimated Ship Date: Dec 14, 2026 if shipped by air
Steering Column Clock Spring, Wiring Harness, Jeep, Each
Part Number: CWA-56047103AC
Estimated Ship Date: Jan 18, 2027 if shipped by air
Estimated Ship Date: Jan 18, 2027 if shipped by air
Brake Line, Braided Stainless Steel, Jeep, Rear, 3-5 in. Lift, Each
Part Number: SJA-RBL40
Not Yet Reviewed
Estimated Ship Date: Nov 2, 2026 if shipped by air
Estimated Ship Date: Nov 2, 2026 if shipped by air
Ball bearing, single row, two seals
Part Number: SKF-6307-2RSJ
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2026 if ordered today
Estimated Ship Date: Nov 17, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster