Selected Filters


Loading...

Availability


JEEP 2.5L/150 Summit Racing Parts and Accessories

Individual Parts

Results 1 - 25 of 33

Thermostat, 180 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each

Part Number: SUM-359-180

4.42 out of 5 stars ( 152 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Thermostat, 160 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each

Part Number: SUM-359-160

4.35 out of 5 stars ( 80 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Oil Filter Relocation Kit, Single Filter, 96 in. Hose Length, Kit

Part Number: SUM-G4985-1

3.87 out of 5 stars ( 157 )

Estimated Ship Date: Nov 27, 2026

...Loading

Estimated Ship Date: Nov 27, 2026

Radiator, Performance Fit, 2-Row, Aluminum, Polished, Jeep, Wrangler, YJ, Each

Part Number: SUM-384047

4.29 out of 5 stars ( 51 )

Estimated Ship Date: Dec 7, 2026 if shipped by air

...Loading

Estimated Ship Date: Dec 7, 2026 if shipped by air

Exhaust Muffler Hanger, Insulator, Rubber, Black, Universal, Each

Part Number: SUM-610400

4.67 out of 5 stars ( 18 )

Estimated Ship Date: Nov 16, 2026 if shipped by air

...Loading

Estimated Ship Date: Nov 16, 2026 if shipped by air

Fuel Tank, Steel, Silver, 15 Gallon, Jeep, Each

Part Number: SUM-255016

4.75 out of 5 stars ( 4 )

Estimated Ship Date: Dec 14, 2026 if shipped by air

...Loading

Estimated Ship Date: Dec 14, 2026 if shipped by air

Radiator Cap, Steel, Natural, 16 psi, Release Lever, Vent, Each

Part Number: SUM-380170

4.56 out of 5 stars ( 9 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Disc Brake Kit, Rear Conversion, Jeep, 1984-2004, Cast Iron Calipers, Kit

Part Number: SUM-BK3009

Not Yet Reviewed

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Oil Filler Cap, Steel, Natural, Twist-In, GM, Mopar, Ford, AMC, Jeep, International, Each

Part Number: SUM-380180

4.68 out of 5 stars ( 37 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Radiator Cap, Steel, Natural, 16 psi, Each

Part Number: SUM-380171

4.4 out of 5 stars ( 10 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Universal Joint, Spicer 1310 Style, Greasable, Steel, Each

Part Number: SUM-732000

3.75 out of 5 stars ( 8 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Heater Cores, Classic OEM, Copper/Brass, Natural, Jeep, Each

Part Number: SUM-382200

3.47 out of 5 stars ( 15 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Thermostat, 195 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each

Part Number: SUM-359-195

4.0 out of 5 stars ( 7 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Radiator Cap, Steel, Natural, 13 psi, Release Lever, Vent, Each

Part Number: SUM-380172

5.0 out of 5 stars ( 7 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Radiator, Classic OEM, Crossflow, Copper/Brass, Black, 2-row, Jeep, Each

Part Number: SUM-382012

4.33 out of 5 stars ( 24 )

Estimated Ship Date: Dec 9, 2026

...Loading

Estimated Ship Date: Dec 9, 2026

Control Arms, Front Rear Top and Bottom for 1997-06 TJ/LJ with lift kits, Double Adjustable, Polyurethane Johnny Joint rod ends,Fasteners inc., Ea.

Part Number: SUM-770270

Not Yet Reviewed

Estimated Ship Date: Dec 14, 2026 if shipped by air

...Loading

Estimated Ship Date: Dec 14, 2026 if shipped by air

Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each

Part Number: SUM-G7742

1.0 out of 5 stars ( 2 )

Estimated Ship Date: Jan 21, 2027

...Loading

Estimated Ship Date: Jan 21, 2027

Disc Brake Kit, Rear Conversion, Jeep, 1984-2004, Cast Iron Calipers, Cross-drilled/Slotted Rotors, Kit

Part Number: SUM-BK3010

Not Yet Reviewed

Estimated Ship Date: Dec 7, 2026 if shipped by air

...Loading

Estimated Ship Date: Dec 7, 2026 if shipped by air

Fuel Tank Cap, Plastic, Black, Buick, Cadillac, Chevy, Chrysler, Ford, Isuzu, Jeep, Kia, Nissan, Toyota, Each

Part Number: SUM-290170

5.0 out of 5 stars ( 7 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Oil Filter, Canister, 3/4-16 in. Thread, 3.740 in. High, Each

Part Number: SUM-127006

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Dec 23, 2026

...Loading

Estimated Ship Date: Dec 23, 2026

Radiator Cap, Steel, Natural, 13 psi, Each

Part Number: SUM-380173

4.2 out of 5 stars ( 5 )

Estimated Ship Date: Dec 18, 2026

...Loading

Estimated Ship Date: Dec 18, 2026

Radiator, Exact Fit, Aluminum, Plastic, Jeep, 2.4L, 2.5L, 4.0L, Each

Part Number: SUM-380546

4.4 out of 5 stars ( 5 )

Estimated Ship Date: Dec 17, 2026

...Loading

Estimated Ship Date: Dec 17, 2026

Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each

Part Number: SUM-G7770

3.2 out of 5 stars ( 5 )

Estimated Ship Date: Jan 14, 2027

...Loading

Estimated Ship Date: Jan 14, 2027

Exhaust System, Cat-Back, 2.50 inch, Single Rear Exit, Steel, Aluminized, Jeep, 2.5, 4.0L, Kit

Part Number: SUM-640003

4.23 out of 5 stars ( 22 )

Estimated Ship Date: Nov 4, 2026

...Loading

Estimated Ship Date: Nov 4, 2026

Radiator Cap, Steel, Natural, 18 psi, Each

Part Number: SUM-380176

4.83 out of 5 stars ( 6 )

Estimated Ship Date: Dec 17, 2026

...Loading

Estimated Ship Date: Dec 17, 2026