Availability
Showing In Stock Items. Show All 471 Items.
Cylinder Head, Vortec, Assembled, Cast Iron, 64cc Chamber, 170cc Intake Runner, Chevy, Small Block, Each
Part Number: NAL-12691728
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
BUILD IT WITH SUMMIT!
Cylinder Head, Vortec, Cast Iron, Assembled, 67cc Chamber, 175cc Intake Runner, Chevy, Small Block, Each
Part Number: SUM-151124
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, Early Model/Vortec, Assembled, Cast Iron, 66cc Chamber, 185cc Intake Runner, Rectangular Ports, Straight Plugs, Chevy, Small Block,Each
Part Number: NAL-19331470
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, Vortec, Cast Iron, Assembled, 64cc Chamber, 171cc Intake Runner, Small Block, Each
Part Number: SUM-151120
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Heads, Assembled, Cast Iron, 64cc Chamber, 185cc Intake Runner, Straight Plug, Chevy, Small Block, Pair
Part Number: PMX-2151
Estimated Ship Date: Oct 29, 2025 if ordered today
Estimated Ship Date: Oct 29, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Cylinder Heads, Cast Iron, Bare, 64cc Chamber, 185cc Intake Runner, Straight Plug, Chevy, Small Block, Pair
Part Number: PMX-2150
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Cylinder Head, 200cc, Assembled, Non-Vortec Bolt Pattern, for Center or Perimeter Bolt Valve Covers, Aluminum, Natural, Chevy, Small Block, Each
Part Number: FLK-1200HRSB505S
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Crate Engine, 350 HO Base, Cast Iron Block, Iron Vortec Cylinder Heads, 330 hp/381 lbs.-ft. Torque, 4-Bolt Mains, Hydraulic Flat Tappet, Chevy, Each
Part Number: NAL-19433030
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, Iron Eagle SS, Cast Iron, Assembled, 67cc Chamber, 170cc Intake Runner, Chevy, 1996-99 Vortec 350, Each
Part Number: DRT-10024370A
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, Fast Burn, Assembled, 62cc Chamber, Rectangular Intake Port, D-port Exhaust, Cast Aluminum, Natural, Chevy, 302, 327, 350, 400, Each
Part Number: NAL-19417592
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Valve Spring Kit, Beehive, Single, 1.075 in./1.310 in. O.D., 7 degree Locks, for GM Vortec Cylinder Heads for Use with Hydraulic Roller Camshafts, Kit
Part Number: CCA-26918VCS-KIT
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Valve Springs Kits, Beehive, Single, 0.510 in. Maximum Valve Lift, for GM Vortec Cylinder Heads for Hydraulic Flat Tappet Camshafts, Kit
Part Number: CCA-26906VCS-KIT
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, E-Tec, Aluminum, Assembled, 64cc Chamber, 200cc Intake Runner, Chevy, 302, 327, 350, 400, Each
Part Number: EDL-60985
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Crate Engine, GM 350 Small Block Stage 3, 290 HP, Long Block, External/Internal Engine Balance, Vortec Heads, Carburetor, Each
Part Number: HPE-HP99C
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Mercury-Mercruiser 4.3L 6Cyl STD LH Rotation, Vortec Cylinder Heads, 2000-2007 Carb/ EFI, 2007-2016 with 58x Crank . Note for MPI Serial 1A063240 & Up
Part Number: QSV-8M0188294
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Rocker Arm Studs, 8740 Chromoly, Fits Chevy 4.3L V6 Vortec Cylinder Heads, Pair
Part Number: ARP-100-7221
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Exhaust Header and Manifold Gaskets, D-Port, Steel Clad with Graphite Coating, Chevy, Small Block, Bowtie/Vortec Cylinder Heads, Pair
Part Number: FOG-7121S
Not Yet Reviewed
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Cylinder Heads, Street Porting, Aluminum, Assembled, 65 cc Chamber, 180cc Intake, Chevy, 302/327/350/400, Pair
Part Number: AFR-0916
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, E-Tec, Aluminum, Assembled, 64cc Chamber, 170cc Intake Runner, Chevy, 302, 327, 350, 400, Each
Part Number: EDL-60975
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head, E-Tec, Aluminum, Assembled, 64cc Chamber, 200cc Intake Runner, Chevy, 302, 327, 350, 400, Each
Part Number: EDL-60989
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Heads, Aluminum, Bare, 190cc Intake, 64cc Exhaust, 65cc Chamber, Chevy, Small Block, Pair
Part Number: AFR-0912NP
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Heads, Aluminum, 195cc Intake Runner, Straight Plug, 2.020/1.600 in. Valves, Chevy, Small Block, Pair
Part Number: MLL-H8002K
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Cylinder Head Bolts, High Performance, 12-Point Head, 180,000 PSI, Chevy, Small Block, Kit
Part Number: ARP-134-3701
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Crate Engine, Vortec, GM 350, 315 HP, Long Block, Internal Front/External Rear Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP74
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Engine Assembly, Stage 2 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32M
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.