Availability
2011 Connecting Rods
Cap Screws, Connecting Rod, ARP 2000, 7/16 in., Set of 4
Part Number: MAN-42390-4
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, FSI I-Beam, 6.125 in. Length, Floating Wrist, Forged 4340 Steel, Shot-Peened, Up To 900 hp, Chevy, Small Block, Set of 8
Part Number: ESP-6125O2000
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rod, Forged 4340 Steel, I-Beam, Cap Screw, Chevy, 6.6L Diesel, Set of 8
Part Number: BLN-GM6418-358
Not Yet Reviewed
Estimated Ship Date: Mar 4, 2026 if ordered today
Estimated Ship Date: Mar 4, 2026 if ordered today
Connecting Rod, 4340 Steel, H-Beam, 6.657 in. Length, Bushed, Cap Screw, Ford, 5.4L/6.8L, Set of 8
Part Number: MAN-14040-8
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Rod Bolts, Pro Wave ARP 2000 Complete, Porsche 911, 10mm
Part Number: ARP-204-6001
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, CRS 4340 H-Beam, 6.243 in. Length, 0.927 in. Pin Diameter, Cap Screw, Bushed, Dodge, Chrysler, Ram, Hemi Gen III, Set of 8
Part Number: ESP-CRS6243H3D
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rod Bolts, 8740 Chromoly Steel, Cracked Cap Design, Chevy, LS Small Block, Pair
Part Number: ARP-134-6026
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
4340 H-BEAM ROD CHR HEMI STROKER ROD
Part Number: ESP-S0048
Not Yet Reviewed
Estimated Ship Date: Apr 8, 2026 if ordered today
Estimated Ship Date: Apr 8, 2026 if ordered today
SINGLE CONNECTING ROD
Part Number: ESP-6125O3DL19-1
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, Stroker, 6.125 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, LS, LT, Set of 8
Part Number: SCA-S0012
Not Yet Reviewed
Estimated Ship Date: Apr 23, 2026 if ordered today
Estimated Ship Date: Apr 23, 2026 if ordered today
CONNECTING ROD SET
Part Number: MAN-14518-8
Not Yet Reviewed
Estimated Ship Date: Mar 25, 2026 if ordered today
Estimated Ship Date: Mar 25, 2026 if ordered today
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.098 in. length, .945 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6098945-1
Not Yet Reviewed
Estimated Ship Date: Apr 9, 2026 if ordered today
Estimated Ship Date: Apr 9, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Summit Racing™ Performance Chevy LS Connecting Rods SUM-LS6098945I
Estimated Ship Date: Monday 2/16/2026
Connecting Rods, Speedway Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.657 in. Long, Ford, Modular V8, Set of 8
Part Number: OLV-F6657MDSW8
Estimated Ship Date: Mar 5, 2026 if ordered today
Estimated Ship Date: Mar 5, 2026 if ordered today
Connecting Rod Bolt, M9 Thread Size, Steel, Chevy, Gen III LS, Each
Part Number: NAL-11610158
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rod, I-Beam, Chromoly 4340 Steel, Shot-Peened, Floating Pin, Mopar, Gen III Hemi, Set of 8
Part Number: BLN-CH6125-927
Not Yet Reviewed
Estimated Ship Date: Mar 4, 2026 if ordered today
Estimated Ship Date: Mar 4, 2026 if ordered today
Connecting Rods, Forged 3-Pocket Beam, 6.125 in. Length, ARP2000 Bolts, 692g, Chevy LS Engines/Gen V LT, Each
Part Number: BLN-LS6125-927S
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Forged Pro Ford Mod Motor 4340 Forged Steel H-Beam Connecting Rod, 5.933 in. Length, .866 Floating Pin, ARP 8740 12 pt. Bolts, Set of 8
Part Number: SUM-MOD59332H
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rod Bolts, Pro Series, Stretch Bolts, Cap Screw, "E" Head Style, 12-Point, 200,000 psi, ARP2000 Alloy, Sea-Doo, Rotax RXP-X255, Set of 6
Part Number: ARP-168-6001
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, CRS Lightweight H-Beam, Forged 4340 Steel, 5.933 in. Length Center To Center, Ford, 4.6L, 5.0L, Set of 8
Part Number: ESP-CRS5933F3D
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rod, Compstar, Forged 4340 Steel, H-Beam, Cap Screw, ARP 2000, Bushed, 6.100 in. Length, Chevy, Small Block, LS, Set of 8
Part Number: CPI-C6100DS6A2AH
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Connecting Rod, H-Beam, 4340 Forged Steel, Bushed, Cap Screw, 6.657 in. Length, Ford, 5.4L, Each
Part Number: ESP-6657F3D
Not Yet Reviewed
Estimated Ship Date: Apr 8, 2026 if ordered today
Estimated Ship Date: Apr 8, 2026 if ordered today
Connecting Rod, Ultra Enforcer, Forged 4340 Steel, I-Beam, Cap Screw, ARP L19, Bushed, 6.125 in. Length, Chevy, Small Block, LS, Set of 8
Part Number: CPI-U17175
Not Yet Reviewed
Estimated Ship Date: May 13, 2026 if ordered today
Estimated Ship Date: May 13, 2026 if ordered today
4340 ROD 6.125 2.100 ROD NO OFFSET
Part Number: ESP-CRS6125O3D-1
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, H-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, Mopar Hemi Gen III, Set of 8
Part Number: ESP-6125SO3D
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster