Availability
1989 JEEP CHEROKEE Parts and Accessories
Electric Fans, 14 in. Diameter, Puller, 1,570 cfm, 14.00 amps, Each
Part Number: HDA-3920
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Muffler, Delta Flow 50 Series, 2 1/4 in. Inlet/2 1/4 in. Outlet, Steel, Black, Each
Part Number: FLO-942452
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Fan, Electric, Triple 10 in. Puller, 2,850 cfm, Plastic Blades, Aluminum Shroud, Jeep, 4.0L, Kit
Part Number: MIO-MMFS-XJ-89
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Gear, Ring and Pinion, 3.54:1 Ratio, 1.375 in. Pinion, 26 Spline, 8.500 in. Ring Gear, Dana 44, Set
Part Number: YGA-24030
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Steering Wheel Installation Kit, Short Hub Steering Wheel Adapter, Aluminum, Silver Anodized, Satin, 6 x 70mm Bolt Circle, AMC, GM, Jeep, Each
Part Number: NGI-SRK-170H-SSL
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Axle Carrier Bearing Puller, Kit
Part Number: YGA-56072
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Speedometer Cable, Female Threads, Black Plastic Jacket, 63.00 in. Length, AMC, Buick, Cadillac, Chevy, Chrysler, Dodge, Ford, GMC, Jeep, Olds, Each
Part Number: PIO-CA-3002
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Floor Panel, Floor Pan Patch, Front Partial Floor Pan, Left Side Front, Steel, Black, Jeep, Each
Part Number: KPT-0482-221L
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiator Cap, Steel, Natural, 13 psi, Release Lever, Vent, Each
Part Number: SUM-380172
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential Carrier, Dura Grip Positraction, Clutch-type, 27-spline, Nodular Iron, Dana 35, Each
Part Number: YGA-26055
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Thermostat, 195 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-195
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Torque Converters, Remanufactured, OEM Style, 1.5 in. Slotted Hub, 4 Pad Mount, 11.5 in. Diameter, Stock Stall, 26 Spline Input, Jeep, 4.0L, Each
Part Number: CCV-TQJ30
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Valve Spring, Standard, Dual, Stock Replacement, Each
Part Number: DCC-68277306AA
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Head Gaskets, PermaTorque MLS, 3.990 in. Bore, Multi-layer Steel, 0.040 in. Thickness, Jeep, 4.0L, Each
Part Number: FEL-26211PT
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Engine Oil, Multi-Grade, Synthetic, 5W30, Quart, Each
Part Number: RPO-01530
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Clutch Kit, 10.472 in. Diameter, Heavy Duty, Street, Off-Road, Jeep, L6, V8, Kit
Part Number: ACL-JP1-HDSS
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55128
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Automatic Transmission Shift Control Solenoids, 3 Solenoids, 2 Brackets, 3 Clips, Jeep, Toyota, Kit
Part Number: ATP-RE5
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Gear Lube, Conventional, 80W90, 3 qt., Each
Part Number: YGA-15002
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Spark Plug, RC9YC, Copper Plus, Flat Seat, 14mm Thread, .750 in. Reach, Projected Tip, Non-Resistor, Each
Part Number: CPN-344
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Differential, Lock-Right, Locker, 27-Spline, Dana 35, Each
Part Number: PWT-2311-LR
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Axle Shaft Assembly, Front Inner and Outer, Driver Side, 27-spline, Steel, Dana 30, Jeep, Each
Part Number: CWA-4874303
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Weather Strip Seal, Door Seal, Rear, Driver and Passenger Side, Jeep, Cherokee, Wagoneer, Kit
Part Number: PQP-DK-6120-84
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
U-Joint, Spicer 1350-1410 Style, Steel, Each
Part Number: YGA-42006
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Steering Wheel Installation Kit, 5-Bolt Mount, Black Luster, Aluminum, AMC, GM, Mopar, Jeep, Kit
Part Number: GRT-5196
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster