Selected Filters


Loading...

Availability


1989 JEEP CHEROKEE Parts and Accessories

Individual Parts

Results 251 - 275 of 2000 +

Electric Fans, 14 in. Diameter, Puller, 1,570 cfm, 14.00 amps, Each

Part Number: HDA-3920

Not Yet Reviewed

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Muffler, Delta Flow 50 Series, 2 1/4 in. Inlet/2 1/4 in. Outlet, Steel, Black, Each

Part Number: FLO-942452

4.5 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Fan, Electric, Triple 10 in. Puller, 2,850 cfm, Plastic Blades, Aluminum Shroud, Jeep, 4.0L, Kit

Part Number: MIO-MMFS-XJ-89

Not Yet Reviewed

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Gear, Ring and Pinion, 3.54:1 Ratio, 1.375 in. Pinion, 26 Spline, 8.500 in. Ring Gear, Dana 44, Set

Part Number: YGA-24030

Not Yet Reviewed

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Steering Wheel Installation Kit, Short Hub Steering Wheel Adapter, Aluminum, Silver Anodized, Satin, 6 x 70mm Bolt Circle, AMC, GM, Jeep, Each

Part Number: NGI-SRK-170H-SSL

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Axle Carrier Bearing Puller, Kit

Part Number: YGA-56072

Not Yet Reviewed

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Speedometer Cable, Female Threads, Black Plastic Jacket, 63.00 in. Length, AMC, Buick, Cadillac, Chevy, Chrysler, Dodge, Ford, GMC, Jeep, Olds, Each

Part Number: PIO-CA-3002

4.21 out of 5 stars ( 19 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Floor Panel, Floor Pan Patch, Front Partial Floor Pan, Left Side Front, Steel, Black, Jeep, Each

Part Number: KPT-0482-221L

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Radiator Cap, Steel, Natural, 13 psi, Release Lever, Vent, Each

Part Number: SUM-380172

5.0 out of 5 stars ( 7 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Differential Carrier, Dura Grip Positraction, Clutch-type, 27-spline, Nodular Iron, Dana 35, Each

Part Number: YGA-26055

3.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Thermostat, 195 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each

Part Number: SUM-359-195

4.0 out of 5 stars ( 7 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Torque Converters, Remanufactured, OEM Style, 1.5 in. Slotted Hub, 4 Pad Mount, 11.5 in. Diameter, Stock Stall, 26 Spline Input, Jeep, 4.0L, Each

Part Number: CCV-TQJ30

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Valve Spring, Standard, Dual, Stock Replacement, Each

Part Number: DCC-68277306AA

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Head Gaskets, PermaTorque MLS, 3.990 in. Bore, Multi-layer Steel, 0.040 in. Thickness, Jeep, 4.0L, Each

Part Number: FEL-26211PT

5.0 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Engine Oil, Multi-Grade, Synthetic, 5W30, Quart, Each

Part Number: RPO-01530

4.96 out of 5 stars ( 27 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Clutch Kit, 10.472 in. Diameter, Heavy Duty, Street, Off-Road, Jeep, L6, V8, Kit

Part Number: ACL-JP1-HDSS

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each

Part Number: RAN-RS55128

4.55 out of 5 stars ( 11 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Automatic Transmission Shift Control Solenoids, 3 Solenoids, 2 Brackets, 3 Clips, Jeep, Toyota, Kit

Part Number: ATP-RE5

Not Yet Reviewed

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Gear Lube, Conventional, 80W90, 3 qt., Each

Part Number: YGA-15002

5.0 out of 5 stars ( 4 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Spark Plug, RC9YC, Copper Plus, Flat Seat, 14mm Thread, .750 in. Reach, Projected Tip, Non-Resistor, Each

Part Number: CPN-344

5.0 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Differential, Lock-Right, Locker, 27-Spline, Dana 35, Each

Part Number: PWT-2311-LR

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Axle Shaft Assembly, Front Inner and Outer, Driver Side, 27-spline, Steel, Dana 30, Jeep, Each

Part Number: CWA-4874303

4.57 out of 5 stars ( 7 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Weather Strip Seal, Door Seal, Rear, Driver and Passenger Side, Jeep, Cherokee, Wagoneer, Kit

Part Number: PQP-DK-6120-84

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

U-Joint, Spicer 1350-1410 Style, Steel, Each

Part Number: YGA-42006

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air

Steering Wheel Installation Kit, 5-Bolt Mount, Black Luster, Aluminum, AMC, GM, Mopar, Jeep, Kit

Part Number: GRT-5196

4.0 out of 5 stars ( 17 )

Estimated Ship Date: Monday 4/27/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/27/2026 if shipped by air