Availability
1.5HP Metal Dust Collector, 110V Single Phase 1.5HP Metal Dust Collector, Air Pulse Clean w/ HEPA Filter, 6" Port
Part Number: BAI-1017633
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Welding Rotator, 220V 3Phase Welding Rotator, 6 Ton Capacity, 10"-90" Ø
Part Number: BAI-1017699
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Welding Rotator, 220V 3Phase Welding Rotator, 22 Ton Capacity, 20"-138" Ø
Part Number: BAI-1017701
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
PL-1022VS-V2; 110V Variable Speed Bench Top Lathe, 10" Swing, 22" Bed Length
Part Number: BAI-1228215
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
MLD-1022; 110V Mill Lathe and Drill Combination, 10" Swing 22" between Centers
Part Number: BAI-1228216
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Band Saw, Vertical, Variable Speed, 120 V, 14 in., Each
Part Number: BAI-1230388
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
BSV-18VS-V2; 120V Vertical Band Saw 17-4/8" Throat Depth, 1HP
Part Number: BAI-1230389
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
BSV-20VS-V2; Variable Speed Vertical Band Saw with 20" Throat Depth, 220V 60Htz Single Phase
Part Number: BAI-1230390
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
BSV-24VS-V2; 230V 1Phase Vertical Band Saw 24" Throat Depth, 2HP w/ Rip Fence & Gauge
Part Number: BAI-1230391
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
BSV-18VS-220-V2; 220V Single Phase Vertical Band Saw 18" Throat Depth, 1HP
Part Number: BAI-1230401
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
HPB-20; 220V 3Phase 20 Ton Horizontal Bending Press
Part Number: BAI-1230462
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Cold Saw, 220V 3Phase Heavy Duty Semi-Automatic Cold Saw. 11" Blade Diameter.
Part Number: BAI-1002447
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Cold Saw, 220V 3Phase Heavy Duty Semi-Automatic Cold Saw. 14" Blade Diameter.
Part Number: BAI-1002578
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Cold Saw, 220 Volt 3 Ph Heavy Duty Manually Operated Aluminum Cutting Cold Saw. 14" Blade Diameter
Part Number: BAI-1002589
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Aluminum Cold Saw, 220V 3Phase Heavy Duty Semi-Automatic Cold Saw for Aluminum. 14" Blade Diameter. 3200 RPM
Part Number: BAI-1002591
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Cold Saw, 220V 3Phase Heavy Duty Semi-Auto Column Type Cold Saw. 16" Blade Diameter.
Part Number: BAI-1002633
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Drill Press, 220 Volt Three Phase Gear Driven Drill Press. Power Feed. 1-1/2" Mild Steel Drilling Capacity.
Part Number: BAI-1002872
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Variable Belt Grinder, 110 Volt Three Wheel Variable Speed Belt Grinder. 2" Belt Width. 60" Belt Length.
Part Number: BAI-1000670
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
PM2000B, 5HP 1PH 230V, 30" RIP
Part Number: PMC-PM25130K
Not Yet Reviewed
Estimated Ship Date: Dec 31, 2025 if ordered today
Estimated Ship Date: Dec 31, 2025 if ordered today
Hydraulic Press Brake, 220 Volt 42 Ton, 31" Hydraulic Press Brake. Distance Between Housings is 29".
Part Number: BAI-1000796
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Depth Bead Roller, Sheet Metal, 16-Gauge Capacity, Throat Depth 36 in., Includes Dies, Each
Part Number: BAI-1000862
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Band Saw, Dual Mitering, 220V 3 Ph 13 in. Manual, Each
Part Number: BAI-1001292
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Band Saw, Metal, 220 V, Single Phase, Hydraulic Assist, Each
Part Number: BAI-1001432
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Band Saw, Metal Cutting, 220V 3 Phase Semi-Automatic, 0.250 in. Blade Width, Each
Part Number: BAI-1001521
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Band Saws, BS-350SA, Metal Cutting, 220 V Single-phase, High-torque 2 hp Motor, Semi-auto, Dual Swivel Head, Degrees: 0-60 Right; 0-45 Left, Each
Part Number: BAI-1001570
Not Yet Reviewed
Estimated Ship Date: Dec 26, 2025 if ordered today
Estimated Ship Date: Dec 26, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.