Availability
Valves
Showing In Stock Items. Show All 8 Items.
Valve, Intake, Stainless Steel, 2.100 in. Diameter, 8mm Stem, 5.000 in. Length, Beadlock, Chevy, Ford, Each
Part Number: AFR-7256-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve, Intake, Stainless Steel, 2.080 in. Diameter, 8mm Stem, 5.000 in. Length, Chevy, Set of 8
Part Number: AFR-7255-8
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve, Intake, Stainless Steel, 2.080 in. Diameter, 8mm Stem, 5.000 in. Length, Chevy, Each
Part Number: AFR-7255-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve, Intake, Stainless Steel, 2.125 in. Diameter, 8mm Stem, 5.000 in. Length, Chevy, Set of 8
Part Number: AFR-7253-8
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Valve, Intake, Stainless Steel, 2.125 in. Diameter, 8mm Stem, 5.000 in. Length, Chevy, Each
Part Number: AFR-7253-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve, Intake, Dished, 2.050 in. Head Diameter, 8mm Stem, 0.100 in Over Installed Length, Chevy, Ford, Set of 8
Part Number: AFR-7258-8
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Valve, Intake, Dished, 2.050 in. Head Diameter, 8mm Stem, 0.100 in Over Installed Length, Chevy, Ford, Each
Part Number: AFR-7258-1
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster