Selected Filters


Loading...

Availability


Sensors and Sending Units

Individual Parts

Results 1 - 25 of 70

HOLLEY EASY LEVEL SENDER

Part Number: HLY-19-250-1

3.8 out of 5 stars ( 5 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Nitrous Pressure Sensor, 150 psi, Stainless Steel, 1/8 in. NPT Male, Kit

Part Number: AVM-30-2130-150

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Sending Unit, Water Temperature, 240 Degree F, 1/8 in. x 27 NPT, with Adapters, Electrical, Each

Part Number: SWW-280EA

4.46 out of 5 stars ( 28 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Sending Unit, Oil/Water Temperature, 100-280 degrees F, 1/8 in.-27 NPT, Each

Part Number: SWW-280ED-F

4.31 out of 5 stars ( 48 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Nitrous Pressure Sensor, 100 psi, Stainless Steel, 1/8 in. NPT Male, Kit

Part Number: AVM-30-2130-100

3.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Temperature Sender, Water/Oil, 140-320 Degree, 1/8-27 NPT, 1/4-18 NPT/3/8-18 NPT/1/2-14 NPT Adapters, Kit

Part Number: SWW-280EE-F

4.25 out of 5 stars ( 12 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Gauge Sending Unit, SureFlo Performance, Lever Style, Fuel Level, Electrical, -8 AN Feed and Return Line Diameter, Dodge, 5.9L Diesel, Kit

Part Number: FLE-S0441

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Sending Unit, PSIG, Electrical, Oil Pressure, 150 psi Max, 1/8 in. NPT Thread, 12 in. Wire Lead Connector, Kit

Part Number: AVM-30-2131-150

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Sensor, Coolant Temperature, Brass, Natural, 1/8 in. NPT Thread Size, Kit

Part Number: AVM-30-2013

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Fuel Tank Sending Unit, 73-10 ohm Range, 3/8 in. Pickup Tube, Dodge, Plymouth, Kit

Part Number: TNK-FG69B

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Oil Pressure Sensor, PSIG, 100 psi. Rating, 1/8 in.-27 NPT, Each

Part Number: AVM-30-2131-100

4.5 out of 5 stars ( 8 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Gauge Sending Unit, SureFlo, Lever Style, Fuel Level, Electrical, -8 AN Feed and Return Line Diameter, Chevrolet, GMC, Kit

Part Number: FLE-FPE-SFGM0410

Not Yet Reviewed

Estimated Ship Date: Mar 2, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 2, 2026 if ordered today

Sensor, Air Inlet Temperature, 1/8 in. NPT Male Threads, Aluminum Bung, Kit

Part Number: AVM-302014

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

SureFlo Performance Sending Unit For 2005-2009 Dodge Ram with Cummins

Part Number: FLE-S0381

Not Yet Reviewed

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Sending Unit, Fuel Level, 10-180 Ohm, Each.

Part Number: VDO-226001

4.57 out of 5 stars ( 23 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Fuel Tank Sending Unit, Lock Ring, Gasket, for 15 gallon Tank, Jeep, 4WD, Kit

Part Number: OMX-1772409

3.87 out of 5 stars ( 15 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Pressure Sender 0-80 Psi M10 X 1K 7.0 Psi Warning Contact

Part Number: VDO-360006

4.88 out of 5 stars ( 8 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Temperature Sender, 100-230 Degree, 1/8 in. NPT, 5/8 in. Hex, With Adapters for 1/4 in., 3/8 in.,1/2 in.,Each

Part Number: SWW-280EC

4.0 out of 5 stars ( 10 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Fuel Injector System Components, Budget Pressure Transducer Sensor, Replacement, Kit

Part Number: HLY-554-202

Not Yet Reviewed

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Nitrous Pressure Sensor, 500 psi, Stainless Steel, 1/8 in. NPT Male, Kit

Part Number: AVM-30-2130-500

4.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Nitrous Pressure Sensor, 2,000 psi, Stainless Steel, 1/8 in. NPT Male, Kit

Part Number: AVM-30-2130-2000

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Fuel Tank Sending Unit, 3-Wire, Chevy Corvette, Kit

Part Number: TNK-TAN-C2-9

4.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Replacement Sender, for Autogage Electric Temperature Gauges, Each

Part Number: ATM-2385

4.7 out of 5 stars ( 23 )

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026

Warning Light, Water Temperature, Amber Lens, 3/4 in. Diameter, 230 Degree F Sender, Kit

Part Number: LNG-40152

Not Yet Reviewed

Estimated Ship Date: Monday 1/26/2026

...Loading

Estimated Ship Date: Monday 1/26/2026