Availability
NISSAN SENTRA Ignitions & Electrical
Oxygen Sensor, 4-Wire, 0-1 V, for Nissan, 1.8L, Right Rear, Each
Part Number: NGK-24645
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Crankshaft Position Sensors, for Nissan, 2.5L, Each
Part Number: BCK-180-0716
Not Yet Reviewed
Estimated Ship Date: Mar 3, 2026 if ordered today
Estimated Ship Date: Mar 3, 2026 if ordered today
Electrical Switches, Power Steering Pressure Switch, Replacement, Stock Terminal Type, for Infiniti, for Nissan, Each
Part Number: BCK-201-2370
Not Yet Reviewed
Estimated Ship Date: Mar 3, 2026 if ordered today
Estimated Ship Date: Mar 3, 2026 if ordered today
OIL PRESS SW W/GAUGE
Part Number: BCK-201-2757
Not Yet Reviewed
Estimated Ship Date: Mar 3, 2026 if ordered today
Estimated Ship Date: Mar 3, 2026 if ordered today
Ignition Knock (Detonation) Sensor, Knock Sensor
Part Number: DFP-AS10271
Not Yet Reviewed
Estimated Ship Date: Mar 5, 2026 if ordered today
Estimated Ship Date: Mar 5, 2026 if ordered today
Mass Air Flow Sensor
Part Number: DFP-AF10174
Not Yet Reviewed
Estimated Ship Date: Mar 5, 2026 if ordered today
Estimated Ship Date: Mar 5, 2026 if ordered today
Spark Plug Wire Sets, MPG Plus, Assembled, Solid Core, Black Boots, Green Wires, 8.00mm Diameter, for Nissan, 1.6L, Set
Part Number: GRN-34-1006MPG
Not Yet Reviewed
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
Spark Plug Wire Sets, Assembled, Solid Core, Black Boots, Blue Wires, 8.00mm Diameter, for Nissan, 1.6L, Set
Part Number: GRN-24-1006S
Not Yet Reviewed
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
Power Steering Pressure Sensor
Part Number: RNB-926-455
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Accelerator Pedal Assembly
Part Number: RNB-699-111
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Power Window Switch, Rocker, 6 button Switch, for Nissan, Each
Part Number: RNB-901-800
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Engine Knock Sensor Harness
Part Number: RNB-917-141
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
CRANKSHAFT POSITION SENSOR
Part Number: HLN-2CRK0405
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
MAF SENSOR
Part Number: HLN-2MAF0052
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
POWER STEERING PRESSURE SWITCH
Part Number: HLN-2PSP0008
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Eng Variable Timing Solenoid
Part Number: HLN-2VTS0069
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
TRANS SPEED SENSOR
Part Number: BCK-090-0015
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Throttle Position Sensor, Replacement, Each
Part Number: BCK-158-0612
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Knock Sensor, OEM Replacement, Each
Part Number: BCK-158-0679
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
HI PRESSURE FUEL SNR
Part Number: BCK-159-1141
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Ignition Starter Switches, Replacement, Stock Style, Plastic/Aluminum, Natural, Key Lock Cylinder, for Nissan, Each
Part Number: BCK-201-1913
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Throttle Pos Sensor
Part Number: HTA-TPS0014
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Brake Light Switch, Replacement, for Nissan, Each
Part Number: SMP-SLS645
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Automatic Transmission Input Sensor
Part Number: SMP-SC486
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Eng Variable Timing Solenoid
Part Number: HLN-2VTS0062
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster