Availability
Showing In Stock Items. Show All 17 Items.
Cylinder Head, Performer RPM, Aluminum, Assembled, 63cc Chamber, 171cc Intake Runner, Mopar, 318, 340, 360, Each
Part Number: EDL-60779
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
BUILD IT WITH SUMMIT!
Combo, Ignition, Distributor, Ignition Box, Digital, Ignition Coil, Spark Plug Wires, Mopar, 273-360, Set
Part Number: CMB-06-0035
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 63cc Chamber, 171cc Intake Runner, Mopar, 318, 340, 360, Each
Part Number: EDL-60775
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cylinder Head, Blue Hornet, 18-Degree,175cc Intake, As Cast, 62cc Chamber, Assembled, V8, Mopar, Small Block LA, Chrysler, Dodge, Plymouth, Each
Part Number: AFR-2401
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Battery, RSV Titan8, Lithium, BCI Group 34, 16 Volt, 3,500 Watts, 1,000 Max Amps, 322 Energy Watts, 10.24 in. L, 7.16 in. H, 6.89 in. W, 12 lbs., Each
Part Number: XSP-RSV-S7-1600
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Carburetor, Gasoline, Super Street, 780 cfm, 4-Barrel, Down-Leg, Electric Choke, Vacuum Secondary, Dual Inlet
Part Number: QFT-SS-780-VS
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Gasoline, Super Street, 750 cfm, 4-Barrel, Annular, Electric Choke, Mechanical Secondary, Dual Inlet
Part Number: QFT-SS-750-AN
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Ignition Systems, Sniper 1 EFI, HyperSpark, Ignition Box, Coil, Distributor, Wire Harness, Chrysler, Dodge, Plymouth, Small Block, LA, Kit
Part Number: SNE-565-304K
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Street-Q, 850 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-850
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Gasoline, Super Street, 750 cfm, 4-Barrel, Down-Leg, Electric Choke, Mechanical Secondary, Dual Inlet
Part Number: QFT-SS-750
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Gasoline, 4150, 750 cfm, 4-Barrel, Down-Leg, Billet Metering Blocks, Dual Inlet, Each
Part Number: QFT-Q-750
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Street-Q, 950 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-950
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Torque Converter, Holeshot, 2,800-3,200 rpm Stall Range, Mopar, Torqueflite 727, Each
Part Number: BMM-10425
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Torque Converters, Twister Full Race, 3,200-3,600 rpm Stall Speed Range, 24-spline, 10.00 in. Diameter, A727/A727 (36RH), Chrysler, Dodge, Jeep, Each
Part Number: HAY-97-3A32F
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Carburetor, Alcohol, Holley 2-Barrel Flange, 500 cfm, 2-Barrel, Annular, Circle Track, 1.375 in. Rule, Each
Part Number: QFT-XP-4412-A
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Distributor, Digital E-Curve, Pro-Billet, Magnetic Pickup, Electronic, Vacuum Advance, Chrysler, Small Block
Part Number: MSD-8504
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.