Availability
Showing In Stock Items. Show All 247 Items.
Automatic Transmission, GM Bellhousing, Automatic Valve Body, Standard Shift Pattern, GM, 4L60E, 2WD/RWD, Aluminum Pan, Each
Part Number: SUM-700465
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Automatic Transmission, Street and Strip, Automatic Valve Body, Forward Shift Pattern, Chevy, GMC, 4L80E, RWD
Part Number: BMM-118002
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Crate Engine, Vortec, GM 350, 315 HP, Long Block, Internal Front/External Rear Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP74
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP31
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Fuel Injection System, Pro-Flo 4, Self-Learning, Sequential Multi-Port, Satin, 450 HP Max, SB Chevy with Vortec or E-Tec heads, Kit
Part Number: EDL-35780
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Automatic Transmission, Remanufactured, Forward Shift Pattern, Automatic/Manual Valve Body, Chevy, TH400, Each
Part Number: TCI-211005
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Automatic Transmission, Remanufactured, Forward Shift Pattern, Automatic, Manual Valve Body, Chevy, TH400, Each
Part Number: TCI-211000
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Engine Assembly, Crate Engine, TBI Truck Stroker, Long Block, 1-Piece Main Seal, Chevy, 383, Each
Part Number: HPE-HP05
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Fuel Injection System, Pro-Flo 4 XT, Self-Learning, Sequential Multi-Port, 450 HP Max, SB Chevy with Vortec or E-Tec heads, Kit
Part Number: EDL-35823
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Engine Assembly, Crate Engine, 2-Bolt Main, Long Block, for TBI or Carburetor, Chevy 350, Hydraulic Flat Tappet Cam, 1987-95, VIN Code K, Each
Part Number: VRE-350G8795
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Fuel Injection System, Pro-Flo 4 XT, Self-Learning, Sequential Multi-Port, Satin, 450 HP Max, SB Chevy with Vortec or E-Tec heads, Kit
Part Number: EDL-35820
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
BluePrint Engines 50 State Legal replacement 350CI Vortec Truck 1996-2002 Crate Engine
Part Number: MLL-G3509602
Not Yet Reviewed
Estimated Ship Date: Nov 25, 2025 if ordered today
Estimated Ship Date: Nov 25, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Chevrolet, GMC, 7.4L/454, Each
Part Number: VRE-DCE1
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Automatic Transmission, Remanufactured, Forward Shift Pattern, Automatic Valve Body, Chevy, TH400, Each
Part Number: TCI-211001P1
Not Yet Reviewed
Cannot be shipped Internationally if ordered today
Cannot be shipped Internationally if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Chevrolet, GMC, 7.4L, CNG Fuel, Each
Part Number: VRE-DCK2CNG
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, GM, 5.7L, Each
Part Number: VRE-DCA2
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Chevrolet, GMC, 7.4L/454, Each
Part Number: VRE-DC44
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Automatic Transmission, Forward Shift Pattern, Automatic Valve Body, Chevrolet, 4L80E, Each
Part Number: BMM-118001BM
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Crate Engine, Remanufactured, Long Block, Assembled, GM, 5.7L, Each
Part Number: VRE-VCM9
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Monday 9/29/2025
Crate Engine, Remanufactured, Long Block, Assembled, Chevrolet, GMC, 7.4L/454, Each
Part Number: VRE-DC59
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
BluePrint Engines 50 State Legal replacement 350CI 1987-1995 Crate Engine
Part Number: MLL-G3508795
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, GM, 5.7L, Each
Part Number: VRE-DCM9
Not Yet Reviewed
Estimated Ship Date: Nov 6, 2025 if ordered today
Estimated Ship Date: Nov 6, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Chevrolet, GMC, 5.7L/350, Each
Part Number: VRE-VCA2
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Clutch Kit, Pro Street Dual Disc, 1.125 in. - 26-spline, Metallic Disc, Pressure Plate, Flywheel, Chevy, 454 Balance, Kit
Part Number: RAM-60-2137N
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Bumpers, Deluxe Bumper, Fabricated, Steel, Black Powdercoated, Winch Mount, Front, Chevrolet, GMC, Kit
Part Number: ARB-3462030
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.