Availability
CHEVROLET 5.7L/350 Engines & Components
Cylinder Head, 180cc, Assembled, Hydraulic Roller, Straight, Aluminum, Natural, Chevy, Small Block, Each
Part Number: FLK-102-505
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro SBC Stage 4 Hyd. Roller Cam, 224/232 Dur. 112 LSA + 2 Adv, .550/.540 1.5 Ratio, .587/.576 1.6 Ratio, 2000-6500 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-8803
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Camshaft, BTR, Red Hot, 221 int. Duration, 0.619 in./0.617 in. Lift, 113 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-BTR-REDHOT
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, GM LS, Set of 8
Part Number: ESP-FSI6125O
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Chevy, Small Block, Kit
Part Number: SUM-K1102
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Crankshaft, 2-Piece Seal, Internal Balance, Cast Steel, 3.480 in. Stroke, Chevy, 350, Each
Part Number: SUM-180365
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Head Fasteners, 12-point Style, Stud, Mixed Length Lower, Early LS Style, 8740 Chromoly Material, 180,000 psi, Black Oxide Finish, Kit
Part Number: ARP-234-4316
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Oil Pan, Chevy LS, Aluminum, Rear Sump, Engine Swap, Kit
Part Number: NAL-19212593
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Lifters, Hydraulic Roller, Chevy, Set of 16
Part Number: CCA-850-16
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, LS1 LS2 LS6 LS7 LS9 LS3 LH6 LQ4 LQ9, Each
Part Number: SUM-8712R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-8720R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-8707R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro SBC Stage 2 Hyd. Roller Cam, 212/218 Dur., 112 LSA + 0 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio,1500-6000 RPM Range, 87-02 Gen 1 Roller Block
Part Number: SUM-8801
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Black Powdercoated, Textured, Brian Tooley Racing Logo, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA02BLKCM
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Valve Covers, Cast Aluminum, Black Powdercoat, Tall, Chevrolet, Bowtie Emblem, Chevy, Small Block, Pair
Part Number: PRO-141-921
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cam and Lifter kit, Pro SBC Hyd. Roller Hot Cam Plus, 218/227 Dur., 112 LSA + 1, .525/.520 1.5 Ratio,1800-6300 RPM Range, '87-02 Gen 1 Roller Block
Part Number: SUM-K8802
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Oil Pan, Engine Swap, Cast Aluminum, Black, 6.0 Quart Capacity, 4.25 in. Stroke Clearance, Chevy, LS, V8, Each
Part Number: SUM-121200B
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 274/274, Lift .450/.450, Chevy, Small Block, Kit
Part Number: SUM-K00172
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Harmonic Balancer, Super Damper, Internal Balance, Steel, Black, Chevy, Small Block, Each
Part Number: ATI-917246
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Black, SFI 18.1, Chevy, Pontiac, Each
Part Number: ATI-917303
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Crankshaft, 2-Piece Seal, Internal Balance, Cast Steel, 3.480 in. Stroke, Chevy, 350, Each
Part Number: SCA-910442
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Connecting Rods, SIR 5140 Steel I-Beam, Bushed, Chevy, Small Block, Set of 8
Part Number: ESP-5700BBLW
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster