Availability
Fuel Line, Stainless Steel, Pump to Carburetor, Each
Part Number: CST-CVC1036-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-Bent, Front and Rear, Stainless Steel, Natural, Chevy, Kit
Part Number: CST-CV1004-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Pre-Bent Brake Line Kit, Steel, Natural Finish, for Front Disc/Rear Drum Brakes, Chevy, Kit
Part Number: CST-CE1019-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Pre-Bent Brake Line Kit, Steel, for Front Disc/Rear Drum Power Brakes, Chevy, 2-piece Front To Rear Only, Kit
Part Number: CST-CA1018-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-Bent, Front and Rear, Steel, Natural, Chevy, Kit
Part Number: CST-EL1019-OE
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Automatic Transmission Cooler Lines, Steel, Chevy, Powerglide, TH350, Pair
Part Number: CST-CAT1001-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Chevrolet El Camino Transmission Lines (Sold In Pairs) -1978,1979,1980,1981,1982,1983,1984,1985
Part Number: CST-MCT1005-OE-2
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Oldsmobile 88 Brake Line Kit Hardtop Power Disc -1974,1975,1976
Part Number: CST-IB1059-OE
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Transmission Lines (Sold In Pairs)- Stainless Steel
Part Number: CST-CTT1019-SC
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, Chevy, 350, 454, Left Side, Each
Part Number: CST-CVV1001-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Tank To Pump Line, Steel, Natural, 3/8 in. Fuel Line Diameter, Chevy, 350, 454, Each
Part Number: CST-CVF1011-OE
Not Yet Reviewed
Estimated Ship Date: Tomorrow if ordered today
Estimated Ship Date: Tomorrow if ordered today
Tank To Pump Line, Stainless, 3/8 in. Fuel Line Diameter, Chevy, GMC, Fits Short Bed Single Tank Models, Each
Part Number: CST-CTF1011-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Fuel Line Diameter, Chevy, Hardtop Models Only, Each
Part Number: CST-CEF1010-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Automatic Transmission Modulator Line, Stainless Steel, Chevy, TH400, Each
Part Number: CST-CTM1004-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Fuel Vapor Lines, Stainless Steel, Natural, 5/16 in. Line Diameter, Tank To Canister, Chevy, L6, V6, V8, Pair
Part Number: CST-CAV1002-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Tank To Pump Line, Stainless Steel, Natural, 3/8 in. Diameter, Chevy, GMC, Fits Long Bed Fuel Injected, Each
Part Number: CST-CTF1084-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Fuel Return Line, Stainless Steel, Natural, 1/4 in. Line Diameter, Chevy, Fits Hardtop Models Only, Each
Part Number: CST-CER1001-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-Bent, Power Disc Brakes, Front and Rear, Steel, Natural, Chevy, Kit
Part Number: CST-CV1010-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Automatic Transmission Cooler Lines, Steel, Chevy, TH400, Pair
Part Number: CST-CAT1002-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-Bent, Stainless Steel, Front/Rear, Chevy, GMC, Kit
Part Number: CST-CT1068SB-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-bent, Stainless Steel, Natural, Chevy, GMC, Kit
Part Number: CST-CT1203SB-SS
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Brake Lines, Pre-Bent, Stainless Steel, Natural, Chevy, GMC, 4WD, Kit
Part Number: CST-CT1144SB-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Fuel Lines, Replacement Fuel Supply Lines, Fuel Tank To Fuel Pump, Stainless, Natural, for Use with Dual Fuel Tanks, Chevrolet, GMC, 6.0L, 8.1L, Set
Part Number: CST-CTF1155-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
BRAKE LINE KIT
Part Number: CST-CT1093-SS
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Tank To Pump Line, Steel, Natural, Chevy, 5.0L, 5.7L, Fits Models with Throttle Body Injection Only, Each
Part Number: CST-CAF1010-OE
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.