Availability
CHEVROLET COMP Cams Camshafts & Valvetrain
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 270/270, Lift .470/.470, Chevy, Small Block, Kit
Part Number: CCA-CL12-211-2
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam/Lifters/Valvetrain, Hydraulic Flat Tappet, Adv. Duration 284/296, Lift .574/.578 in., Chevy, Big Block
Part Number: CCA-K11-250-3
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam/Lifters/Timing, Hydraulic Flat Tappet, Advertised Duration 268/280, Lift .477/.480, Chevy, Small Block
Part Number: CCA-SK12-242-2
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 314/314, Lift .612/.612, Chevy, Big Block, Each
Part Number: CCA-11-470-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 299/319, Lift .533/.519, Chevy, Small Block, Each
Part Number: CCA-08-602-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arm Stud Girdles, Solid Bar Design, 7/16 in.-20 Thread, Standard Stud Spacing, 6061-T6 Aluminum, Red Anodized, Chevy, Brodix-2, Big Block, Kit
Part Number: CCA-4021
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam/Lifters/Valvetrain, Hydraulic Flat Tappet, Adv. Duration 262/270, Lift .504/.510 in., Chevy, Big Block
Part Number: CCA-K11-238-3
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 292/292, Lift .501/.501, Chevy, Small Block, Each
Part Number: CCA-12-213-3
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 304/304, Lift .612/.612, Chevy, Big Block, Each
Part Number: CCA-11-460-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Includes Installation Tool, Buick, Cadilac, Chevy, GMC, LS, Kit
Part Number: CCA-13702TL-KIT
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam/Lifter, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 283/303, Lift .513/.498, Chevy, 5.0, 5.7L
Part Number: CCA-K08-600-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 282/288, Lift .510/.520, Chevy, Small Block, Each
Part Number: CCA-12-432-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 264/270, Lift .510/.510, Chevy, Big Block, Each
Part Number: CCA-01-412-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft Kits, Stage 2 LST Master Camshaft Packages, Hydraulic Roller, Advertised Duration 292/297, Lift 0.632/0.627, Lifters, Chevy, 6.2L, Kit
Part Number: CCA-MK54-303-11
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 268/268, Lift .454/.454, Chevy, Small Block, Each
Part Number: CCA-12-210-2
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Timing Cover, 2-Piece, Aluminum, Natural, Chevy, Big Block, Kit
Part Number: CCA-212
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/280, Lift .525/.525, Chevy, Small Block, Each
Part Number: CCA-12-430-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 256/268, Lift .447/.454, Chevy, Small Block, Each
Part Number: CCA-12-234-2
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 264/269, Lift .488/.495, Chevy, Small Block, Kit
Part Number: CCA-CL08-501-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 288/294, Lift .520/.540, Chevy, Small Block, Each
Part Number: CCA-12-433-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arms, Ultra Pro Magnum, Full Roller, 1.8 Ratio, Chromoly Steel, Pedestal Mounting, Chevy, Set of 16
Part Number: CCA-1677-16
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Mechanical Roller Tappet, Advertised Duration 280/280, Lift .550/.550, Chevy, Small Block, Each
Part Number: CCA-12-702-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 270/274, Lift .474/.474, Chevy, Small Block, Each
Part Number: CCA-12-413-8
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Rocker Arms, Stud Mount, Roller Tip, Steel, 1.6 Ratio, Fits 3/8 in. Stud, Chevy, V8, Small Block, Set of 16
Part Number: CCA-1416-16
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .474/.474, Chevy, Small Block, Each
Part Number: CCA-12-411-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster