Availability
Differential Carrier Rebuild Kits and Spider Gears, Spider Gear Sets, AMC Model 35, 27-spline, 10-bolt, Rear, American Motors, Jeep, Kit
Part Number: SPZ-39030
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Ring and Pinion Gears, 3.73:1 Ratio, 26-spline, Standard Ring Gear Rotation, Dana 30 Jeep, Dana Super 30, Set
Part Number: SPZ-36031
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Transfer Case Input Shaft, Transfer Case Input Shaft
Part Number: SPZ-ZTNP17949
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Manual Transmission Blocking Ring, Manual Transmission Blocking Ring
Part Number: SPZ-ZMSRTOY-14C
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
This is a complete package that includes front & rear ring & pinion sets along with the most complete master o
Part Number: SPZ-40005
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
4340 Chromoly axle shaft, left hand inner for TJ & XJ, 30 spline, uses 5-760X u/joint
Part Number: SPZ-35075
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
16.96" 30spl D44 TJ RUBICON_ONLY LH FRONT INNER AXLE
Part Number: SPZ-35119
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
D30 27spl FRONT AXLE KIT, w/ Super-Joint, 82-86 CJ JEEP (ASSM_REQ)
Part Number: SPZ-35129
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Ring and Pinion Gears, 4.56:1 Ratio, 29-spline, Standard Ring Gear Rotation, Dana 60, Set
Part Number: SPZ-36076
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Differential Ring and Pinion, USA Standard Ring & Pinion gear set for Chrysler 8.25" in a 3.07 ratio
Part Number: SPZ-36350
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
This is a complete package that includes front & rear ring & pinion sets along with the most complete master o
Part Number: SPZ-40007
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Axle Shaft, C-clip, 30-spline, 30.375 in. Length, Driver Side Rear, Dana 44, Jeep, Each
Part Number: SPZ-35015
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
4340 Chromoly Axle, XJ/TJ/YJ LH inner, 27spl, uses 5-760X u/joint
Part Number: SPZ-35081
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
4340 Chromoly Axle, XJ/TJ/YJ RH inner, 27spl, uses 5-760X u/joint
Part Number: SPZ-35082
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
4340 Chromoly Axle, XJ/TJ/YJ outer stub, 27spl, uses 5-760X u/joint
Part Number: SPZ-35084
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
RING AND PINION GEARS, USA Standard ring & pinion sets
Part Number: SPZ-36330
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Manual Transmission Rebuild Kits , NSG370 M/T BEARING KIT '12-'14 JEEP W/SYNCHROS
Part Number: SPZ-70173
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Transmission Bearing and Seal, AX4/AX5 Kit 87-90 Jeep Cherokee/87-92 Comanche/87-90 Wagoneer/87-02 Wrangler 4-Speed/5-Speed Manual Trans
Part Number: SPZ-71798
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Axle 8.25" CHY REAR, '02-'07 JEEP LIBERTY, 30-7/8", 29spl, 1.620" BRG, 1 SIDE (w/o ABS_ring)
Part Number: SPZ-12115
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Axle D30 JK 4340 FRONT, '07-'17 JEEP WRANGLER SPORT & SAHARA, 25-1/4", LH, 7166 U/JOINT
Part Number: SPZ-12161
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Differential Carrier, Spartan Locker, Steel, 27-spline, Rear, Chrysler 8.25 in., Each
Part Number: SPZ-17037
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Ring and Pinion Gears,USA Standard 8.25" CHRYSLER, 3.73 Ratio Rear Ring & Pinion GearInstall Kit 29 Spline and 1.62" ID Axle Bearings & Seals
Part Number: SPZ-10907
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Axle D44 FRONT, 03-06 JEEP RUBICON TJ, RH , 30spl, 37.96" overall
Part Number: SPZ-12162
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Manual Transmission Bearing Retainer, Manual Transmission Bearing Retainer
Part Number: SPZ-ZMNV3500-6A
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Spartan Locker for Dana 30 JL M186 Differential
Part Number: SPZ-17046
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.