Availability
Summit Racing Tools & Shop Equipment
AN Wrench, Aluminum, Anodized, -10 AN, Each
Part Number: SUM-900110
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Masking Machine, Masking Tape Stand, Each
Part Number: SUM-918068
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Thread Cleaning Chasers, 6mm x 1.00, 8mm x 1.25, 10mm x 1.50, 12mm x 1.25, 12mm x 1.50, 12mm x 1.75, Steel, Set
Part Number: SUM-900198
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Air Tank, Portable, 3 Gallons, Aluminum, Natural, Hose, Pressure Gauge, Each
Part Number: SUM-901162
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pinion Yoke Wrench, Iron, Each
Part Number: SME-906005
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Apron, Black, Cotton, Summit Racing Equipment® Logo, Pockets, Each
Part Number: SUM-G1995-1
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Clamps, Butt-Weld, Welding Clamp, Sheet Metal, 1 in. Size, Steel, Zinc Plated, Set of 4
Part Number: SUM-9785235
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ratchet, Black EDP, 72-Tooth, Steel, 3/8 in. Drive, Each
Part Number: SUM-90702
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Crankshaft Holding Tool, Crank Holder, Steel, LS Series Engines, Chevy, GMC, Each
Part Number: SUM-900179
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Transmission Replica Mock Up Block, 8HP70, Each
Part Number: SUM-774014
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Impact Wrench. 1/2 in. Impact, 20V, Variable Speed, Brushless Motor, 300 ft/lbs. Torque Output, No Battery, No Charger, Each
Part Number: SUM-900581
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Shop Gloves, Textured Nitrile Gloves, Textured Grip, Nitrile Rubber, Orange, 7 mil Thickness, Large, Set of 100
Part Number: SUM-530580-L
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Power Tools, 20V, Rivet Gun, 5/32", 3/16", 15/64", 1/4" Rivets, Pulling Force 4500 LBF, Each
Part Number: SUM-900589
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Scrub Brush, Hand and Nail, Each
Part Number: SUM-904004
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Flare Tool, Double, 45 Degree Flare, Tube Sizes 3/16, 1/4, 5/16, 3/8, 1/2 in., Kit
Part Number: SUM-900310
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Porting and Polishing Set, Deburr Kit, Carbide, 2 in. Bits, 1/4 in. Shank, Set of 4
Part Number: SUM-900240
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Creeper, Black, Steel Frame, 250 Lbs. Capacity, Each
Part Number: SUM-G1069-BLK
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Floor Mat, Anti Fatigue, Diamond Plate Design, Polyurethane, Black, Summit Racing Equipment® Logo, 36 in. x 24 in., 0.590 in. Thick, Each
Part Number: SUM-941128
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Shop Towels, Terry Cloth, White, Set of 12
Part Number: SUM-960008
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Welder, MIG/MMA, Gas and Gasless, Multi-Process, 120/220 V, 200 Amps, 0.030 in. to 0.040 in. Wire, Gas Regulator, Kit
Part Number: SUM-900934
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pro-grade Digital Caliper, 0-6 in. range, 0-150mm, with ..0005 accuracy, SAE and Metric conversion, IP67 Rated for harsh conditions,
Part Number: SUM-900463
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Tool Tray, Magnetic Tool Box Mount, 12 in. tray, 6 in. Tray, Spray Can Tray, Paper Towel Holder, Kit
Part Number: SUM-900229
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cord Reel, Retractable, 40 ft. Cord, 12 Gauge, Black, Each
Part Number: SUM-917061
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Creeper, Red, Steel Frame, 250 Lbs. Capacity, Each
Part Number: SUM-G1069-RED
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ring Compressor, Aluminum, Black Anodized, 3.905 in. Bore, Each
Part Number: SME-903905
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster