Availability
32 Results Found For "Pro"
Distributor Advance Kit, Springs, Bushings, Kit
Part Number: SUM-850120
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Clamp Down, Summit, MSD, Chevy, Kit
Part Number: SUM-G5245
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cap and Rotor, Black, Male/HEI, Brass Terminals, Screw-Down, Summit, V8, Kit
Part Number: SUM-G5246
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Wiring Harness, Mechanical Distributor to Ignition Box, 24 in. Long, Each
Part Number: SUM-850613-24
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Distributor Cap, Thermoplastic, Blue, Female/Socket, Brass, Screw-Down, Summit, Billet, Each
Part Number: SUM-G5243
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Wiring Harness, Mechanical Distributor to Ignition Box, 48 in. Long, Each
Part Number: SUM-850613-48
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Distributor Rotor, Stainless Steel/Brass, V8, Each
Part Number: SUM-G5242
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster