Availability
2012 Engines & Components
Lifters, Hydraulic Roller, 0.842 in. O.D., Horizontal Link Bars, Chevrolet, Set of 16
Part Number: CXM-J-2126LSR
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Harmonic Balancer, Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Short Spacing, 5.7, 6.0, 6.2L, Each
Part Number: SUM-C2503
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Galley Barbell Plug, OEM-Style, Billet Aluminum, Viton® O-Rings, Chevy, LS, Each
Part Number: IRP-EGM-501
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Camshaft, HRT Stage 1, Hydraulic Roller, 1,700-6,500 Range, 0.520./0.515 Lift, 114 LSA, Dodge, Chrysler, Jeep, RAM, Hemi, Each
Part Number: CCA-201-300-17
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Head Studs, Pro Series, 12-point, Custom Age 625, Black Oxide, 11mm Thread Size, Washers, Chevy, Kit
Part Number: ARP-234-4314
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-1
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
GM LS Compatible 376 c.i. Pro Series Engine - 510 Horsepower - Deluxe Dressed - Polished Pulley Kit - Holley Terminator X EFI System
Part Number: MLL-S0064
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Pro LS 2618 Forged Piston, 4.000 bore, 1.299 C.H., 2cc Flat, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-2999274000-2
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Alternator and Power Steering Brackets, Driver Side, Alternator Upper Mount, Power Steering Lower Mount, Billet Aluminum, Chevy, LS, Kit
Part Number: ICB-551519X-3
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Lifter, Factory Hydraulic Roller, AFM, Chevy, Each
Part Number: MEL-JB-8011
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Rod Bearing, H Series, .010 in Crankshaft Undersize, TM-77, Chevy, Small Block, Each
Part Number: CLE-CB663HN10
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cylinder Head Studs, Pro Series, 12-Point Head, Chevy, LSX, Kit
Part Number: ARP-234-4319
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Variable Valve Timing VVT Delete Combo, Cam Bolts, 3-bolt Cam Sprocket, Timing Cover, Damper Bolt, Chevy, 4.8L, 5.3L, 6.0L, 6.2L, Kit
Part Number: CMB-09-0027
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pistons, Pro Tru Street Pistons, 4.030 in. Bore, Forged, Dome, Please Verify Piston Pin Diameter Before Ordering, Chevrolet, LS, Kit
Part Number: WIS-PTS523A3
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 58x, 6.125 rod, 21cc dish, 9.9:1 @ 65cc, 9.5:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R584007021
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Main Bearings, SI-Series, 1/2 Groove, Standard Size, Bi-metal, Silicon Aluminum, Chevy, 4.8, 5.3L, Set of 5
Part Number: KGB-MB5293SI
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Rocker Arms, Pedestal Mount, 1.7 Ratio, Aluminum, Roller Rockers, Chevy, LS, Set
Part Number: CSP-SLS17
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Rocker Arm, Standard Replacement, Steel, Chevrolet, LS, Each
Part Number: MEL-MR1341
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Single Roller, BIllet Steel Sprockets, 3-Bolt, 4X Cam, Chevy, LS3, 6.2L, Set
Part Number: SUM-G6642
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-3269434030-2
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster