Availability
Connecting Rods, Ultra, H-beam, 6.385 in. Length, Forged 4330 Steel, Shot-peened, Chevy, Big Block, Set of 8
Part Number: CPI-U16200
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Connecting Rods, 4340 H-Beam, Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: MAN-14054-8
Not Yet Reviewed
Estimated Ship Date: Oct 7, 2025 if ordered today
Estimated Ship Date: Oct 7, 2025 if ordered today
Connecting Rod, H-Beam, 4340 Forged Steel, Cap Screw, Floating, 7.100 in. Length, Chevy, Chrysler, Set of 8
Part Number: ESP-7100C3D2000
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, Big Block Max Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.700 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6700BBMX8
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, H Beam, 6.535 in. Length, Chromoly 4340 Steel, 2.200 in, Journal Diameter, 0.990 in Floating Wrist Pin, ARP Cap Screws, Chevy BB, Set
Part Number: CPI-S0007
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, 400, V8, Set of 16
Part Number: ARP-134-6002
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, CRS Lightweight H-Beam, Forged 4340 Steel, 5.700 in. Length Center To Center, Chevrolet, Each
Part Number: ESP-CRS5700BLW-1
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Connecting Rod Bolts, Manley Replacement Bolts, L19 alloy, Chevy, Small Block, V8, Set of 4
Part Number: MAN-42296-4
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, CRS 4340 H-Beam, 5.565 in. Length, Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: ESP-CRS5565B3D
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
4340 ROD BBC 6.800" ROD ARP L19 BOLT
Part Number: ESP-CRS68003DL19
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
4340 H-BEAM ROD 5.700" 2.100 ROD
Part Number: ESP-CRS5700B3D-1
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, Ultra, H-beam, Forged 4330 Steel, 6.700 in. Length, Floating, Chevy, Big Block, Set of 8
Part Number: CPI-U16230
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, ARP 2000 PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC61352H
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Chevy SB 5.700" Stroker - Boost Line
Part Number: BLN-SC5700-927
Not Yet Reviewed
Estimated Ship Date: Sep 10, 2025 if ordered today
Estimated Ship Date: Sep 10, 2025 if ordered today
Chevy BB 6.135" - Boost Line
Part Number: BLN-BC6135-990
Not Yet Reviewed
Estimated Ship Date: Sep 10, 2025 if ordered today
Estimated Ship Date: Sep 10, 2025 if ordered today
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.100 in. Length, Chevy, Small Block, LS1, Set of 8
Part Number: SCA-26100944P
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rod, I-Beam, Chromoly 4340 Steel, Shot-Peened, Floating Pin, Chevrolet, Small Block, Set of 8
Part Number: BLN-SC6000-927
Not Yet Reviewed
Estimated Ship Date: Sep 11, 2025 if ordered today
Estimated Ship Date: Sep 11, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Connecting Rods, Compstar, Forged, H-Beam, ARP Cap Screws, Bushed Pin, 6.700 in. Length, Chevy, Set of 8
Part Number: CPI-B6700ES3B9AH
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, CRS 4340 H-Beam, 5.765 in. Length, Cap Screw, Bushed, Chevy, L4, Set of 4
Part Number: ESP-CRS5765C3D
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, Big Block Max Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.385 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6385BBMX8
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, Big Block Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.700 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6700BB8
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, Speedway Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.000 in. Long, Chevy, Small Block, Set of 8
Part Number: OLV-C6000STSW8
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.100 in. Length, Chevy, 4.8/5.3/5.7/6.0L, Set of 8
Part Number: SCA-66100927
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
4340 ROD BBC 6.535" ROD ARP L19 BOLT
Part Number: ESP-CRS65353DL19
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
4340 I-BEAM RODS CHEVY SB ARP 2000 BOLT
Part Number: ESP-FSI5700B2000
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.