Availability
Showing In Stock Items. Show All 71 Items.
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, Small Block, LS1, Set of 16
Part Number: ARP-134-6006
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
BUILD IT WITH SUMMIT!
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.125 in. length, .927 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6125927-1
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, Small Block, Big Block W, Set of 16
Part Number: ARP-134-6003
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rods, 5140 Steel, I-Beam, 5.700 in. Length, Bushed, Chevy SB, Each
Part Number: ESP-SIR5700BB-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cap Screws, Connecting Rod, ARP 2000, 7/16 in., Set of 4
Part Number: MAN-42390-4
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod Bolts, High Performance Wave-Loc, 8740 Chromoly Steel, Chevy, 305, 307, 350, V8, Set of 16
Part Number: ARP-134-6403
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod Bolts, 12-Point, Cap Screw, 7/16 in. Thread, 1.600 in. Length, Chevy, H-Beam, Set of 4
Part Number: MAN-42249-4
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cap Screws, Connecting Rod, ARP 2000, 3/8 in., Set of 4
Part Number: MAN-42350-4
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.098 in. length, .945 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6098945-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, 350, LT1/LT4, Set of 16
Part Number: ARP-134-6005
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Rod Bolts, High Performance Series, Chevy, 383 Stroker with 350 Rods, Extra Head Clearance, Set of 16
Part Number: ARP-134-6027
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, Chevy, Small Block, V8, Set of 16
Part Number: ARP-134-6004
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
5140 STEEL I-BEAM CHEV SB 5.700" PRESS
Part Number: ESP-SIR5700BP-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Wrist Pin Bushing, 0.860 in Inside Diameter, 0.973 in. Outside Diameter, 1.060 Length, Bronze, Set of 8
Part Number: ESP-B927-8
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Connecting Rod, FSI I-Beam, Forged 4340 Steel, Shot-Peened, 5.700 in. Length, Chevy, Small Block, Each
Part Number: ESP-FSI5700B-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
5140 STEEL I-BEAM LS 6.100" .943" PIN
Part Number: ESP-SIR6100NLW-1
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
5140 STEEL I-BEAM CHEV SB 6.000" BUSHED
Part Number: ESP-SIR6000BB-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pin Bushing, Connecting Rod Replacement Parts. Ampco Pin Bushings.
Part Number: MAN-42366-8
Not Yet Reviewed
Estimated Ship Date: Oct 16, 2025 if ordered today
Estimated Ship Date: Oct 16, 2025 if ordered today
5140 STEEL I-BEAM LS 6.1" BUSHED
Part Number: ESP-SIR6100M-1
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Connecting Rod, 4340, I-Beam, 12-Point, Cap Screw, 6.200 in. Length, Chevy, Small Block, Each
Part Number: SCA-26200716-1
Not Yet Reviewed
Estimated Ship Date: Nov 7, 2025 if ordered today
Estimated Ship Date: Nov 7, 2025 if ordered today
CONN ROD BOLTS
Part Number: PIO-S-1035
Not Yet Reviewed
Estimated Ship Date: Sep 18, 2025 if ordered today
Estimated Ship Date: Sep 18, 2025 if ordered today
5140 STEEL I-BEAM CHEV SB 5.700" 2.00"
Part Number: ESP-SIR5700SB-1
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Connecting Rod, ROD-SBC 6.000 H LITE LJ
Part Number: MAN-14034-1
Not Yet Reviewed
Estimated Ship Date: Oct 16, 2025 if ordered today
Estimated Ship Date: Oct 16, 2025 if ordered today
Connecting Rod, 4340 Steel, H-Beam, Natural, 6.2 in., Chevy, Small Block, Each
Part Number: HRS-TS62002100-1
Not Yet Reviewed
Estimated Ship Date: Oct 23, 2025 if ordered today
Estimated Ship Date: Oct 23, 2025 if ordered today
SINGLE SBC CONNECTING ROD
Part Number: SCA-26000716-1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.